Laserfiche WebLink
progress of work. Where, in the discretion of the inspector, it is inecessary, he shall post notice upon the <br />premises stating that work has been approved and may be covered, or it is not approved and may not be <br />covered until such further inspection as is necessary has been, made. Any person destroying, altering or <br />defacing such notice without the consent of the inspector, shall be deemed guilty of an offense under this <br />section, and any work described in the notice shall be stayed pending the further necessary inspection. <br />Upon the completion of the work that has been authorized by the issuance of a permit, it shall be the duty <br />of the master electrician to whom the permit has been issued to immediately notify the inspector, who <br />shall inspect such installations within three days, exclusive of weekends and holidays, of the time such <br />notice was given. <br />(Ord. No. 1637, § 1(3.03), 3-13-89; O, rd. No. 96-2079-E, § 3, 540-04; Ord. No. 2013-3481, § 6, <br />5-13-13) <br />Sec. 82-309. - Authorization for electrical service. <br />If the work is found to be in compliance with the provisions of this article, the inspector, subject to the <br />other applicable provisions of this article, shall issue a final approval to the public utility corporation <br />furnishing the electrical service or the person supplying the energy, which approval shall authorize <br />connection of such approved work to the source of energy of the electrical service, the turning on of <br />current and the use of the installation, No connection shall be made until such authorization and final <br />approval is given. <br />(Ord. No. 96,-2079-14, § 5, 9-12-015) <br />Editor's note— Ord. No�. 96-2079-11, § 5, adopted September 12, 20,051, amended § 82-309 in its <br />entirety to read as herein set out. Former § 82-3019 pertained to certificate of approval, and. <br />derived frorn Ord. No . 1637, § 1(3.04), 3 -13 - 8 9 . <br />Sec. 82-310. - Reinspection; correction of unsafe conditions. <br />The inspector shall make, upon information or belief that faulty conditions exist, a thorough, <br />reinspection of any electrical wiring, apparatus, devices, appliances, fixtures and equipment now installed <br />or that may hereafter be installed and within the scope of this article, and when the installation of such <br />wiring, apparatus, devices, appliances, fixtures and equipment is found to be at variance with the original <br />permit issued, or to be in a dangerous or unsafe condition, or if it is found that the electrical measuring <br />device has been tampered with so as to create a condition dangerous to the continuity of the electrical <br />service or to property, the person owning, using or operating the same shall be notified in writing and <br />shall make the necessary repairs or changes required to place such wiring, apparatus, devices and <br />equipment in safe condition so as to relieve the hazards created by such unauthorized conditions, and <br />shall have such work completed within ten days, or any reasonably longer period specified by the <br />inspector in the written notice. <br />(Ord, No. 1637, § 1(3.05), 3-13-89; Ord. No. 96-2079-14, § 6, 9-12-05) <br />Sec. 82-311. - Schedule of fees for inspection. <br />The master electrician making or supervising installation or alteration of electric wiring, apparatus, <br />devices, appliances, fixtures or equipment, shall pay to the city fees in such amounts as established by <br />the city and fisted in, appendix A of this Code. <br />(Ord. No. 1637, § 1(106), 3-13-89) <br />