My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-14-11 Regular Meeting and Workshop Meeting of La Porte City Council minutes
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2011
>
03-14-11 Regular Meeting and Workshop Meeting of La Porte City Council minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2024 3:03:02 PM
Creation date
7/25/2025 11:24:50 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
3/14/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
"EXHIBIT C" <br /> Page 2 of 3 <br /> b) The use of earthen berms with approximately 31 side <br /> slopes, SO' wide at the base and 8' high. The berms <br /> may be landscaped with a combination of trees, shrubs, <br /> and ground cover. Al]. berms and landscaping will be <br /> maintained by the property owners. <br /> c) A screening plan, to be approved by the City, that <br /> includes a combination of trees, shrubs, and ground <br /> cover that after 5 years growth will be at least 20 <br /> feet in height and shall, together with shrubs and <br /> ground cover, create a continuous visual screen. <br /> Provided, however, in public utility easements or <br /> rights-of-way, the vegetation shall be installed and <br /> maintained in a manner which is acceptable to the <br /> public utility company, and does not interfere with the <br /> operation and maintenance of the public utility <br /> facilities. <br /> For items b and c above, the actual length of required <br /> screening along the roadway will be equal to the length of <br /> the new development that is parallel to the roadway. <br /> Screening shall not be required for new development that is <br /> to the rear of or behind existing facilities. <br /> In all cases the 50' strip, along the entire roadway <br /> frontage, shall be dedicated as a landscape easement and <br /> shall be kept free from any improvements except for approved <br /> driveway access and identification signs. <br /> For cases of new development or improvements where a 50' <br /> landscape easement is not available or practical, Company <br /> shall meet with City to determine a suitable landscaping <br /> alternative. <br /> d) In the case of land contiguous to Fairmont Parkway, in <br /> addition to the other requirements of these Rules and <br /> Regulations, Company shall dedicate to City by Plat a <br /> ten foot (10') wide pedestrian and bicycle easement, <br /> extending along Company's Fai4mont Parkway boundary, <br /> within the fifty foot (50') landscape easement. The <br /> pedestrian easement shall not be within any pipeline <br /> facility, except for necessary crossings. <br /> 3. Driveways opening from said strip of land onto State Highway <br /> 225 or State Highway 146 shall be subject to the rules and <br /> regulations of the Texas Department of Transportation and <br /> provisions of the City's Code of Ordinances, whichever is <br /> more restrictive. <br /> Driveways opening from said strip of land onto Fairmont <br /> Parkway shall be subject to the rules and regulations of <br /> Harris County and provisions of the City's Code of <br /> Ordinances, whichever is more restrictive. <br />
The URL can be used to link to this page
Your browser does not support the video tag.