My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-25-11 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2011
>
04-25-11 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2015 5:10:39 PM
Creation date
7/25/2025 11:25:12 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
4/25/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(a) Trash, rubble and any flammable materials. <br /> (h) Sand, concrete and construction materials: <br /> (c) Containers of any type or character fpt <br /> The purpose of storing trash. <br /> (d} Any material defined in environmental <br /> regulations as a solid waste, regulated <br /> toxic material or hazardous Material_ <br /> 3.6 DOCUMENTATION REQUIREMENTS <br /> 3.6,1 The Grantee /Contractor shall have a copy of the <br /> signed Agreement at all times at the <br /> construction site where the operation of <br /> equipment is within Company Property. It is the <br /> Grantee's responsibility to provide a copy of <br /> this specification to the Contractor and to <br /> ensure that all the provisions in the Agreement . <br /> are followed. <br /> 3.6.2 Any necessary field changes or modifications to <br /> j the Agreement must be approved in writing by the <br /> Company Representative prior to construction by <br /> the Grantee /Contractor. <br /> 3.6.3 It is the Grantee /Contractor's responsibility to <br /> r"‘, examine all the available records and to make'a <br /> field inspection of the site and Company <br /> Property for determination of the surface <br /> conditions and surface water conditions to be <br /> encountered, and the character of equipment and <br /> facilities needed for the desired -work. <br /> 3.7 N0TIFICA`PION REQUIREMENTS <br /> 3.7.1 The Grantee /Contractor shall be responsible for <br /> 3 notifying all parties having an interest in or <br /> an easement on, under or above the subject <br /> Company Property. The construction requirements <br /> of the parties with prior rights shall be <br /> observed; however, the company's specification <br /> for Construction shall be adhered to as a <br /> minimum. <br /> 3_7.2 The Grantee /Contractor shall notify the Company <br /> Representative seven (7) days prior to beginning <br /> any type of work so that an inspection of <br /> • <br /> R: V. NO.5 SPEC. ID. 007 231 179 I Sheet 5 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.