Laserfiche WebLink
Clean Drought Contingency Plan- La Porte June 2011 Updatedoc (3).docx <br />c. Severe Condition Goal - To achieve a 25 percent reduction in daily water use. <br />d. Critical Condition Goal To achieve a 30 percent reduction in daily water use. <br />E. INFORMATION /EDUCATION <br />As a component of the Information /Education section in the Water Conservation Plan, the <br />purpose and effect of the Drought Contingency Plan will be communicated to the public <br />through an article or notice in the Bay Area Observer, City of La Porte website(s), and other <br />media outlets such as email, text, social media, public access television station, or <br />programmed phone alerts regularly* utilized by the City of La Porte. <br />Throughout the period of a trigger condition, regular updates will appear in the various media <br />outlets to explain and educate the public on the purpose, cause, and methods of conservation <br />for that condition. <br />F. IMPLEMENTATION /ENFORCMENT <br />The plan shall be implemented by Ordinance of the City Council of the city* of La Porte. <br />Included in the adoption instrument will be individual trigger conditions for the city*. A copy* <br />of the adoption vehicle is found in Appendix B. <br />It will be the responsibility* of the City of La Porte Public Works Director to monitor, through <br />the utility* department, the status of the water supply* and distribution system. When a trigger <br />condition is reached, the Public Works Director will notifi- the public through its information <br />program, of the implementation of the Drought Contingency* Plan. <br />The Public Works Director will continue to monitor the water emergency* until it is <br />determined that the trigger condition no longer exists. When this takes place, the Public <br />Works Director will notifi- the public of such, and the Drought Condition Abatement <br />procedures will be implemented. <br />G. UPDATE OF TRIGGER CONDITIONS <br />Once a year, the City will examine the production requirements and ability* to maintain these <br />requirements to determine if trigger conditions need to be reestablished. Consideration <br />should be given to the cityT's usage in relation to the aggregate usage, and any anticipated <br />increase in production at the Southeast Water Purification Plant. <br />Page 5 of 5 <br />