Laserfiche WebLink
2 <br />repositioning. <br />4. Any and all construction materials utilized by the pipeline contractor for access across <br />any and all drainage ditches, drainage paths and /or drainage channels shall be promptly <br />removed by the contractor upon completion of construction at each crossing. <br />5. Any fill material resulting from construction shall be removed or be subject to a Fill <br />Permit from the City. <br />6. Prior to an anticipated major rain event, contractor shall remove all constriction- related <br />materials and /or fill from any drainage way or roadside ditch as to not impede storm <br />water runoff. <br />Upon Council's approval, the Director of Planning will execute a constriction permit to Enterprise <br />Crude Pipeline, LLC in duplicate originals, one which shall be delivered to the Permittee and one <br />which shall be retained by the City. <br />Action Required by Council: <br />Authorize the Planning Director to execute a Pipeline Permit to Enterprise Crude Pipeline, LLC for <br />installation of an 18" crude oil pipeline from Exxon's Bayport to Baytown Corridor to the <br />Enterprise Products Operation facility in Morgan's Point. <br />Approved for City Council Agenda <br />Traci E. Leach, Assistant City Manager Date <br />