My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-12-11 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2011
>
12-12-11 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2011 4:53:51 PM
Creation date
7/25/2025 11:27:07 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
12/12/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested December 12, 2011 <br />Requested By: Julian Garza <br />Department: Planning <br />Report: X Resolution: _Ordinance: <br />Exhibit: Agreement for Professional Services <br />Exhibit: Contract Amendment <br />Appropriation <br />Source of Funds GEN 957 <br />Account Number: 050- 9892 - 957 -1100 <br />Amount Budgeted: $0 <br />Amount Requested: S10,340.00 <br />Budgeted Item: _YES X NO <br />SUMMARY <br />The City of La Porte entered into an agreement for Professional Services with Freese and <br />Nichols for West F Street Drainage Improvements, otherwise known as the S. 16 Street <br />Project. These drainage improvements will provide for an improved drainage system along S. <br />16 Street and provide drainage for the proposed Sector 23 Development. These improvements <br />include relocating the E Street Right -of -Way Drainage Ditch to the D Street Right -of -Way and <br />re- grading the 16 Street roadside ditches to drain to this proposed drainage ditch. <br />Re- grading the ditch along 16 Street will reduce the depth of cover on the existing waterline <br />and in most cases expose the existing waterline; therefore lowering approximately 1,000 feet of <br />12 inch waterline is necessary. This design was not anticipated and is considered a change in <br />scope. <br />Freese and Nichols submitted a proposal for these additional services in the amount of $10,340. <br />This amendment for the change in scope requires City Council approval because it is over <br />$5,000.00. <br />Project Benefits, Liabilities and Annual Operation Cost <br />Relocating the approximately 1000 feet of waterline along South 16 Street will increase the <br />depth of cover on the waterline and allow for improved drainage along South 16 Street. Failure <br />to relocate the line would leave it exposed in many locations and subject the line to potential <br />damage and breaches. There are no annual operating costs associated with this project. <br />Action Required by Council: <br />Authorize the Interim City Manager to execute the contract amendment with Freese and Nichols in the <br />amount of $10,340.00. <br />Approved for City Council Agenda <br />Steve Gillett, Interim City Manager Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.