My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-09-12 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2012
>
01-09-12 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2012 8:43:31 AM
Creation date
7/25/2025 11:27:22 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
1/9/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY COUNCIL DRAINAGE REPORT <br />January 9, 2012 <br />Contract Design and Construction <br />• Design of Sheet Flow Relief Structure Improvements to Creekmont, Fairmont <br />Park West, Brookglen and Fairmont Park East. All work is complete. Consultant <br />is preparing as -built plans, inspections and project closeout. <br />• North and South 16 th Streets. Design in progress; plans at 90 %. <br />In -House Design and Construction of Citv- Initiated Proiects <br />• F -216 Regional Detention Project. Construction is approximately substantially <br />complete. <br />• Battleground Estates and Shady River Reports. Reports to be presented during <br />Drainage Committee Meeting scheduled for January 18, 2012. <br />• Harris County Hydro Excavation Notice to proceed issued on F 101 -06 -00 <br />Engineering. Work in progress. <br />• Battleview Area Survey and design complete. Plans submitted for pipeline and <br />agency review. <br />• East Main. Pre - constriction meeting held on December 19, 2011. <br />• Adams Street. Addressing pipeline conflict. <br />In -House Drainage Maintenance Activities <br />• North Shady Lane Working with HOA to secure easement to improve and clean <br />existing drainage swale on South Shady Lane and making design modifications to <br />North Shady Lane. <br />• Sunrise and Broadway. Project will be constricted by Public Works but is being <br />delayed to assess the flooding in the area since outfalls were reconstructed by the <br />POH. Public Works will install additional 24 inch culverts at North Shady Lane, <br />South Shady Lane and Baywood along Broadway. <br />• In -Fill Drainage Maintenance. Public Works to begin working on Northside ditch <br />grading. <br />
The URL can be used to link to this page
Your browser does not support the video tag.