Laserfiche WebLink
REQUEST FOR CITY COUNCILAGENDA ITEM <br />Budget <br />Agenda Date Requested: March25, 2013 <br /> <br />Source of Funds: N/A <br />Requested By: David Mick <br /> <br />Account Number: <br />Department:Public Works <br />Amount Budgeted: <br />Report: Resolution: Ordinance: <br /> <br />Amount Requested: <br />Exhibit:Summary 02-13 Utility CIP <br />Exhibit:Sewer Overflow History <br />Budgeted Item:N/A – For Discussion <br />Exhibit: Watermain Age/Materials <br />Exhibit: Potential Bond Project Area <br />Exhibit: Draft 4-YRCIP <br />Exhibit: Water Projects on Hold <br />Exhibit: Utility Rate History <br />Exhibit: Utility Rate Survey of Other Communities <br />Staff is presenting a Utility Capital Improvement Program (CIP) report to City Council for <br />council’s consideration and comment at the March 25, 2013 council meeting. This update <br />includes a review of the Utility CIP over the 10-year period from 2002 –2011, staff’s vision for <br />a Utility CIP over the next 10-years, and a look at the funding necessary to complete the <br />improvements. Please note that all costs provided in this report have been adjusted to 2013 <br />values. <br />Highlights of the Previous 10 – 15 years: <br />The city water and sewer utility system is in good overall condition. Fortunately, the utility <br />system has been significantly improved in recent yearsto the credit of past and present city <br />council members and city staff. <br />There has been a very dramatic decrease in the number of occurrences of untreated <br />sewageoverflows out of the collection or treatment system from 116 in 1995 to ZERO in <br />5of the last 10-years. The reduction in sewage overflows is a direct result of consistent <br />funding by the cityand the sewer maintenance staff’s efforts each year over the past 20- <br />years purposed toward reducing inflow/infiltrationin the sanitary sewer system. <br />There were significant improvements made to the city waste water treatment plant <br />between 2002 – 2009 totaling $12-millionincluding an expansion in the treatment plant <br />capacity from 16.8-million gallons per day (MGD) to 21.8-MGD (2-Hr Peak Flow). <br />Since 2004, 8 lift stations were rebuilt or rehabilitated with a total cost of $3-million. <br />Existing water mains were replaced along portions of Main Street (2012), Broadway <br />(2010), Sens Road [water and sewer] (2010), Valleybrook (2009), Spenwick Subdivision <br /> <br />