My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-10-14 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2014
>
02-10-14 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 9:34:22 AM
Creation date
7/25/2025 11:32:27 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
2/10/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Budget <br />Agenda Date Requested: February 10, 2013 <br />019 (Drainage Fee) <br /> <br />Source of Funds: 033 (Street Tax) <br />Requested By:David Mick <br /> <br />Account Number: <br />Department:Public Works <br />019 ($60,000) <br /> <br />Amount Budgeted:033 ($150,000) <br />Report: ___Resolution:_____Ordinance:_________ <br />019 ($ 35,000) <br /> <br />Amount Requested: 033 ($110,000) <br /> <br />Budgeted Item:YESNO <br />Exhibit:Cobb Fendley Professional Services Proposal <br />SUMMARY & RECOMMENDATION <br />The FY 14 budget includes an allocation for the design of Catlett (Valleybrook to Farrington), <br />Belfast (Valleybrook to Farrington), and Pineybrook (Antrim to Carlow). The City of La Porte <br />selected the firm of Cobb, Fendley & Associates, Inc.to provide professional engineering <br />services for the design, bidding,and construction phase services for this project. The price <br />proposal submitted by Cobb Fendley (attached) totaled $137,750.00. The total request is <br />$145,000.00 including a $7,500 contingency. The total request is below the budget amount of <br />$230,000.00. The construction estimate (FY 15) is $2,300,000. <br />The price proposal references Phase 1 and Phase 2 areas. Staff directed Cobb Fendley to <br />consider the potential for a phased project with the proposal in the event that budget dictated a <br />need to reduce the project scale. Phase 1 includes Pineybrook and the segments of Catlett and <br />Belfast between Valleybrook and Pineybrook. Phase 2 includes the segments of Catlett and <br />Belfast from Pineybrook to Farrington. The HDR street inspection rating was 2 of 9 (9 being the <br />best) for the Phase 1 area; 3 of 9 for the Phase 2 area. Staff recommends constructing both <br />phases simultaneously to complete the improvements from Valleybrook (reconstructed in 2008) <br />to the newly reconstructed Farrington Boulevard roadway. <br />Anticipated completion of the design is June, 2014. Anticipated bid date is first quarter FY 15. <br />At least one public meeting with the residents is anticipated during the design process along with <br />other resident contacts to identify any access or other considerations of the residents. <br />Benefits: <br />The project will address several of the lower rated concrete street segments identified in the 2013 <br />comprehensive street inspection report. <br />Liabilities: <br />Deferring the project construction would add to future year maintenance responsibilities unless <br />substituted with a like project. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.