Laserfiche WebLink
BID SPECIFICATION <br />2.4ROOFING <br />A.All roofing materialswill be supplied byRomtec. <br />1.Glulam beams <br />2.Tongue and groove decking <br />3.Sheathing <br />4.Metal panelroofing <br />2.5RESTROOMFIXTURES <br />A.Restroom fixtures shall be supplied by Romtec. <br />1.Floormount toilets and manualflush valves <br />2.Sinks and faucets <br />3.Grab bars <br />4.Toilet paper dispensers <br />5.Soap dispensers <br />6.Towel dispensers <br />2.6PLUMBING <br />A.Plumbing rough-inshall be supplied by Romtec. <br />1.All underground water service to building and sewer drain(s) from building to <br />be as specified in final site plan. <br />2.All floor drains shall be as shown on final building plans. <br />3.Building water shutoff valve, drain, and all rough piping shall be as shown on <br />final building plans. Final location to be set onsite. <br />Note:Minimum water pressure at toilet and urinal flush valves (1-½ in. inlet <br />pipe shall be 50 psi.), minimum pipe sizing as per 2009 Uniform Plumbing Code <br />Section 610. <br />Special Note:Romtecdoes not provide a final site plan. <br />B.Plumbing installation andtrimshall be supplied by Romtec. <br />1.Install the supplied fixtures and all other plumbing supplies as specified in final <br />plans. <br />Romtec Inc. <br />Page 6of 8 <br /> <br />