My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-23-14 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2014
>
06-23-14 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2014 8:32:14 AM
Creation date
7/25/2025 11:33:18 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
6/23/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY COUNCIL DRAINAGE REPORT <br />June 23, 2014 <br />Contract Design and Construction <br /> <br />North P Street Culvert replacement. Hydraulic Impact Analysis on HCFCD F101-00-00 completed. <br />Submitted request for a variance needed for a no significant impact decision to construct. Submitted <br />request to Director of Harris County Flood Control District. <br />F101-00-00 Channel Improvements by HCFCD. Hydro excavation of pipelines in corridor completed. <br /> <br />Engineering Report finalized. Meeting with pipeline coalition to discuss variance for depth of cover will <br />be required and scheduled in July. Submitted request to place project on HCFCD CIP. <br /> <br /> <br />Third Street Paving and Drainage Improvements. Construction may begin in July after fabrication of <br />Culverts. Preconstruction meeting with residents to be held within thirty days. <br />ЉЉ <br />HCFCD A104-00 <br />Ώ \[ğƉĻƭ ğƷ CğźƩƒƚƓƷ DƩĻĻƓƭ tĻķĻƭƷƩźğƓ .ƩźķŭĻ͵ tƩƚƦƚƭĻķ wh ƒğƦ ƓĻĻķƭ ƩĻǝźƭźƚƓ Ʒƚ ğƌƌƚǞ <br /> <br />ğĭĭĻƭƭ ƩĻƨǒźƩĻƒĻƓƷƭ ĬǤ I/C/5͵ tƩĻƌźƒźƓğƩǤ .ƩźķŭĻ \[ğǤƚǒƷ ķĻǝĻƌƚƦĻķ͵ <br /> 5ĻƭźŭƓ ǒƓķĻƩǞğǤ Ʒƚ ķƩğźƓ ǞĻƭƷ ƭźķĻ ƚŅ .ƩƚğķǞğǤ Ʒƚ ƷŷĻ ĻƭƷ͵ <br /> <br />Design underway to re-slope D street ditch between 8th Street and SH 146 <br /> <br /> <br />F 216-00-00 Channel Improvements. Environmental approval from US Army Corp of Engineers <br /> <br />expected in June or July. <br /> <br /> <br />D Street Improvements. Design complete. Preparing for construction of D Street Ditch ultimate tie-in to <br />regional detention pond. <br />In-House Design and Construction of City-Initiated Projects <br /> <br />Brookglen Subdivision Buyouts. Submitted request to HCFC for assistance to secure Federal funds to <br />complete buyouts. Currently working with Utility Companies to remove above ground appurtenances on <br />empty lots. <br /> <br />Y Street Storm Sewer and Inlets. Design completed. Construction Completed May 2014. <br />In-House Drainage Maintenance Activities <br /> <br />Reset 1743 feet of Storm Sewer and Culverts to grade. <br /> <br />- ditches in the last six months. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.