My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-26-16 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2016
>
09-26-16 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2016 8:58:47 AM
Creation date
7/25/2025 11:38:11 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
9/26/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEMREQUEST FOR CITY COUNCIL AGENDA ITEM <br />September 26, September 26, AppropriationAppropriation <br />Agenda Date Requested:Agenda Date Requested: <br />20162016 <br />003 Utilities CIP003 Utilities CIP <br />Source of Funds:Source of Funds: <br />Sharon ValianteSharon Valiante <br />Requested By:Requested By: <br />003.7085.533.1100003.7085.533.1100 <br />Account Number:Account Number: <br />AdministrationAdministration <br />Department:Department: <br />$165,000.00$165,000.00 <br />Amount Budgeted:Amount Budgeted: <br />Report:Resolution:Resolution:Ordinance:Ordinance: <br />Amount Amount <br />$86,968.00$86,968.00 <br /> Requested:Requested: <br />Other: <br />Budgeted Item:Budgeted Item:YESYESNONO <br />AttachmentsAttachments : : <br />1.Bid TabulationBid Tabulation <br />2.Vendor Access ReportVendor Access Report <br />3.Project LocationProject Location <br />4.Bid FormBid Form <br />SUMMARY & RECOMMENDATIONSSUMMARY & RECOMMENDATIONS <br />The water main extension along the 146 southbound feeder is identified in the fiscal year 2016 CIP The water main extension along the 146 southbound feeder is identified in the fiscal <br /> year 2016 CIP <br />budget for design and construction. The waterline extension runs parallel with the south bound feeder budget for design and construction. The waterline extension runs parallel with the <br /> south bound feeder <br />crossing under Little Cedar Bayou on the west side of Highway 146. The project scope is to install crossing under Little Cedar Bayou on the west side of Highway 146. The project scope <br /> is to install <br />approximately 530 LF of 8approximately 530 LF of 8PVC waterline with appurtenances. The 8PVC waterline with appurtenances. The 8PVC waterline will be installed PVC waterline will <br /> be installed <br />utilizing horizontal directional drilling in lieu of open cut. The method of construction is the best option for utilizing horizontal directional drilling in lieu of open cut. The method <br /> of construction is the best option for <br />the project in order to eliminate exposure to the environmental conditions that exist within the project the project in order to eliminate exposure to the environmental conditions that <br /> exist within the project <br />boundaries. The waterline extension will provide a looped system, additional fire protection, and boundaries. The waterline extension will provide a looped system, additional fire protection, <br /> and <br />improved water quality. improved water quality. <br />ststststthththth <br />Bid 16021 was advertised in the Bay Area Observer on July 21Bid 16021 was advertised in the Bay Area Observer on July 21, and 28, and 28, posted on Public Purchase , posted on Public <br /> Purchase <br />and the Citys website. The access report is attached. Bid 16021 SH 146 Feeder Water Line Project s website. The access report is attached. Bid 16021 SH 146 Feeder Water Line Project <br /> <br />was opened and read on August 9, 2016, two bids were received. Low bid is Armadillo Construction at was opened and read on August 9, 2016, two bids were received. Low bid is Armadillo <br /> Construction at <br />$78,968.00. <br />City staff contacted references provided by Armadillo construction and verified timely and successful City staff contacted references provided by Armadillo construction and verified <br /> timely and successful <br />completion of past projects. Past projects include a 130completion of past projects. Past projects include a 130,,1414steel casing crossing a State Highway in steel casing crossing <br /> a State Highway in <br />the town of Pantego (near Arlington), Texas, 640the town of Pantego (near Arlington), Texas, 640directional drill of a 6directional drill of a 6and a 12and a 12waterline in <br /> Bellville, waterline in Bellville, <br />Texas, and installation of 130 LF of 18Texas, and installation of 130 LF of 18steel pipe in Galena Park, Texas. steel pipe in Galena Park, Texas. <br />Staff Recommends award of Bid 16021 to Armadillo Construction for $78,968 and a contingency of Staff Recommends award of Bid 16021 to Armadillo Construction for $78,968 and a contingency <br /> of <br />$8,000.00. <br />Benefits: <br />There will be increased fire protection and improved water quality eliminating dead end waterlines.There will be increased fire protection and improved water quality eliminating dead <br /> end waterlines. <br />Liabilities: <br />None <br />Operating Costs: Operating Costs: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.