BIDTABULATION
<br />BID#17012HEADSTARTFACILITYPARKINGIMPROVEMENTS
<br />DUE:FEBURARY28,2017AT2:00P.M.
<br />AZTECREMODELINGAND
<br />PANORAMA
<br />LANDSCAPINGCO.
<br />Item
<br />No.UnitUnitPriceUnitPrice
<br />GeneralItems QtyTotalPriceTotalPrice
<br />1Mobilization1LumpSum$12,170.00$12,170.00$25,000.00$25,000.00
<br />2TrafficControlandRegulation1LumpSum$1,970.00$1,970.00$3,000.00$3,000.00
<br />3Sodding1,000SY$3.49$3,490.00$5.00$5,000.00
<br />GeneralItemsSubtotal$17,630.00$33,000.00
<br />ExistingParkingAreaItems
<br />4ThermoplasticPavementMarkingsRegularParkingSpace(11)1LumpSum$605.00$605.00$700.00$700.00
<br />5ThermoplasticPavementMarkingsRegularADA/HcapSpace(2)1LumpSum$325.00$325.00$750.00$750.00
<br />6ThermoplasticPavementMarkingsVanADA/HcapSpace(1)1LumpSum$165.00$165.00$300.00$300.00
<br />ExistingParkingAreaItemsSubtotal$1,095.00$1,750.00
<br />ParkingArea1Items
<br />76"ConcretePavement258SY65.35$16,860.30$63.00$16,254.00
<br />84"CementStabilizedSand(CSS)50Tons58.91$2,945.50$70.00$3,500.00
<br />9ConcreteCollar2EA$1,534.40$3,068.80$1,200.00$2,400.00
<br />10AInlet(modifiedcollarperdetail)1EA$575.40$575.40$2,500.00$2,500.00
<br />11StormSewer18"RCP111LF$72.82$8,083.02$60.00$6,660.00
<br />12ThermoplasticPavementMarkingsRegularParkingSpace(10)1LumpSum$575.40$575.40$700.00$700.00
<br />ParkingArea1ItemsSubtotal$32,108.42$32,014.00
<br />ParkingArea2Items
<br />133"AsphaltPavement167Tons$181.00$30,227.00$140.00$23,380.00
<br />1410"RecycledCrushedCon.Base(RCCB)500Tons$45.21$22,605.00$60.00$30,000.00
<br />15Lime6"Treatment(8%)23Tons$246.60$5,671.80$155.00$3,565.00
<br />166"LimeStabilization1,000SY$5.95$5,950.00$8.00$8,000.00
<br />17ThermoplasticPavementMarkingsRegularParkingSpace(25)1LumpSum$1,438.50$1,438.50$1,500.00$1,500.00
<br />ParkingArea2Subtotal$65,892.30$66,445.00
<br />ParkingArea3Items
<br />183"AsphaltPavement48Tons$181.00$8,688.00$140.00$6,720.00
<br />1910"RecycledCrushedCon.Base(RCCB)142Tons$45.21$6,419.82$60.00$8,520.00
<br />20Lime6"Treatment(8%)7Tons$246.60$1,726.20$155.00$1,085.00
<br />216"LimeStabilization284SY$5.95$1,689.80$8.00$2,272.00
<br />22ConcreteCollar2EA$1,534.40$3,068.80$1,200.00$2,400.00
<br />23AInlet(modifiedcollarperdetail)1EA$1,205.60$1,205.60$2,500.00$2,500.00
<br />24StormSewer18"RCP134LF$72.79$9,753.86$60.00$8,040.00
<br />25ThermoplasticPavementMarkingsRegularParkingSpace(12)1LumpSum$690.48$690.48$800.00$800.00
<br />ParkingArea3Subtotal$33,242.56$32,337.00
<br />ParkingArea4Items
<br />263"AsphaltPavement19Tons$181.00$3,439.00$140.00$2,660.00
<br />2710"RecycledCrushedCon.Base(RCCB)57Tons$45.19$2,575.83$60.00$3,420.00
<br />28Lime6"Treatment(8%)3Tons$246.60$739.80$155.00$465.00
<br />296"LimeStabilization114SY$5.95$678.30$8.00$912.00
<br />30ConcreteCollar1EA$1,534.40$1,534.40$1,200.00$1,200.00
<br />31StormSewer18"RCP60LF$69.64$4,178.40$60.00$3,600.00
<br />32ThermoplasticPavementMarkingsRegularParkingSpace(5)1LumpSum$287.70$287.70$400.00$400.00
<br />ParkingArea4Subtotal$13,433.43$12,657.00
<br />BASEBIDTOTAL$163,401.71$178,203.00
<br />Item
<br />ItemDescriptionQtyUnitUnitPriceTotalPriceUnitPriceTotalPrice
<br />No.
<br />ALTERNATEBIDITEMS
<br />9(DEDUCT)ConcreteCollar2EA$1,200.00$2,400.00$1,200.00$2,400.00
<br />10(DEDUCT)AInlet(modifiedcollarperdetail)1EA$980.00$2,500.00$2,500.00
<br />$980.00
<br />11(DEDUCT)StormSewer18"RCP111LF$60.00$60.00$6,660.00
<br />$6,660.00
<br />ParkingArea1Subtotal$10,040.00$11,560.00
<br />ParkingArea3Items
<br />22(DEDUCT)ConcreteCollar2EA$1,200.00$2,400.00$1,200.00$2,400.00
<br />23(DEDUCT)AInlet(modifiedcollarperdetail)1EA$980.00$980.00$2,500.00$2,500.00
<br />24(DEDUCT)StormSewer18"RCP134LF$60.00$60.00$8,040.00
<br />$8,040.00
<br />ParkingArea3Subtotal$12,940.00
<br />$11,420.00
<br />ParkingArea4
<br />30(DEDUCT)ConcreteCollar1EA$1,200.00$1,200.00$1,200.00$1,200.00
<br />31(DEDUCT)StormSewer18"RCP60LF$60.00$3,600.00$60.00$3,600.00
<br />ParkingArea4Subtotal$4,800.00
<br />$4,800.00
<br />ALTBIDDEDUCTTOTAL$26,260.00$29,300.00
<br />ALTBIDTOTAL(BASEBIDMINUSALTBIDDEDUCT)$137,141.71$148,903.00
<br />Highlightedcellindicatesthattheproposalincludedamathematicalerror.The
<br />numbershownhereisthecorrectedamount.
<br />
<br />
|