<br />A. BASE BID ITEMS
<br />BID ITEM
<br />DESCRIPTION
<br />UNIT
<br />OTY
<br />UNIT PRICE
<br />COST
<br />I
<br />Mobilization, complete in place, the sum of. (5% maximum)
<br />I
<br />L.S.
<br />40,000.00
<br />40,000.00
<br />2
<br />Site Work, including site stripping, grading, seeding or sodding, complete
<br />in place, the sum of
<br />I
<br />L.S.
<br />5,000.00
<br />5,000.00
<br />Construct 50'x20'(1,000 SF) Booster Station Precast Concrete Building,
<br />including but not limited to foundation, bedding and backfill, handrails,
<br />3
<br />floor drains, drain line, roof, sidewalk, pipe bollards, MCC Room and
<br />I
<br />L.S.
<br />equipment, chlorine feed room and equipment, and all associated
<br />000 -00
<br />3-75,cGO
<br />architectural, structural, mechanical, and electrical appurtenances as shown
<br />on plans and as described in specifications, complete in place, the sum of:
<br />4
<br />One (1) Horizontal Split Case Booster Pumps (1,000 gpm @120-ft Head),
<br />I
<br />L.S.
<br />30,000.00
<br />30,000.00
<br />or equivalent, complete in place, the sum of:
<br />5
<br />Two (2) Horizontal Split Case Booster Pumps (650 gpm at 120-ft Head), or
<br />-
<br />equivalent, complete in place, the sum of.
<br />I
<br />L.S.
<br />40,000.00
<br />40,000.00
<br />Station Piping to include all booster pump suction and discharge header
<br />6
<br />piping as identified on the plans, including valves, fittings, and any
<br />requirements for proper operation of the plant as shown on plans and as
<br />I
<br />L.S.
<br />60,000.00
<br />60,000.00
<br />,described in specifications, complete in place, the sum of:
<br />Yard Piping to include all onsite water mains and drain lines outside
<br />booster station building as identified on the plans, including proposed
<br />7
<br />flanged connection to Ground Storage Tank, valves, fittings, wet
<br />I
<br />L.S.
<br />30,000.00
<br />30,000.00
<br />connections, drain lines connection to downspouts and grate inlet, and any
<br />trench safety requirements as shown on plans and as described in
<br />specifications, complete in place the sum of:
<br />Removal of bends, abandonment of water lines and suction lines, and
<br />8
<br />installation of blind flanges as shown on plans and as described in
<br />I
<br />L.S.
<br />2,000.00
<br />2,000.00
<br />specifications, complete in place, the sum of:
<br />Wet connection to existing 12" water line, including two 12" gate valves
<br />9
<br />and boxes, as shown on plans and as described in specifications, complete
<br />I
<br />L.S.
<br />6,000.00
<br />6,000.00
<br />in place the sum of
<br />Remove and replace 6" thick concrete pavement and driveway, including
<br />10
<br />sawcutting, subgrade, reinforcement and joints, complete in place, the sum
<br />145
<br />S.Y.
<br />150.00
<br />21,750.00
<br />of:
<br />Remove and replace existing 8-11 chain link fence, install double 8-11 wide
<br />I I
<br />swing access gate and pedestrian gate as shown on plans and as described
<br />I
<br />L.S.
<br />5,250.00
<br />5,250.00
<br />in specifications, complete in place, the sum of:
<br />Chlorine Disinfection System, including but not limited to, scale for 150#
<br />chlorine cylinder, gas chlorinators, automatic switchovers, injectors,
<br />solenoid valves and bypasses, gas sensor and alarm, wall -mounted self-
<br />12
<br />contained breathing apparatus, high pressure booster pump, piping, feed
<br />I
<br />L.S.
<br />30,000.00
<br />30,000.00
<br />lines, I " schedule 80 PVC injection line, pipe connections, chlorine
<br />injection manhole, electrical, and all other items as shown on plans and as
<br />described in specifications for a complete and operational chlorine
<br />disinfection system, complete in place, the sum of.
<br />Electrical System Installation: Provide and install all work shown on plans
<br />and described in specifications including as follows: Provide and install
<br />motor control center, lighting and receptacles, pump motor feeders and
<br />13
<br />terminal boxes, electrical service equipment, autosensory controls,
<br />I
<br />L.S.
<br />�q 61 CC) 0, 0c)
<br />-3,1 VZ" 0
<br />generator quick connect, and all required appurtenances as shown on plans
<br />and as described in specifications for a complete operating system for a
<br />lump sum of:
<br />TOTAL BASE BID ITEMS (A):