My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-10-19 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2019
>
06-10-19 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:20:18 PM
Creation date
7/25/2025 11:43:42 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
6/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
No. Item Description UOM QTY Unit Price Total Price <br />;Concrete Sidewalk and Curb <br />Removal and Disposal $ 13,600.00 <br />Divieway Re - movaFan, <br />Disposal <br />1,400M <br />'Concrete Curb Replacement <br />(Including extended curb heights) <br />LF## <br />i 000.00 <br />4.0" Concrete Sidewalk <br />Replacement <br />SF <br />$56,000.00 <br />crete Driveway <br />lReplacement <br />Re� <br />$ 7,000-00 <br />j,,V'-C <br />r <br />C u P E urb Ramp FTY Complete in' <br />P1 <br />Place with Detectable <br />D.i$20,000M <br />Curb Ramp (TYPE 12) Complete in <br />Place with Detecable Warning <br />$1,500,00 <br />Sawcut a I I De p th <br />24,000.00 <br />i it <br />ff.o " It Grade <br />ih 0 M11 1 <br />1, Additional Regrading <br />Additional Excavation, incl Bank Sand Per Oty <br />lock Sodding (16" Wide) <br />18,000,00 - <br />Mailbox Removal/Replacement <br />Manhole AdjU5tments <br />A ?nn nn <br />Notes, <br />The Unit Bid prices for the Base Bid Items include the cost of all associated work Items and materials including, but <br />not limited to mobilization and maintenance of traffic in accordance with Texas MUTCD standards. <br />The initial term of this Contract is for a one-year period from the date of Council approval. This contract will <br />Additionally, Contractor understands and agrees that upon the City's written request, this Contract may be extended <br />for a period of time, not to exceed 120 calendar days after expiration of the initial term or any renewal thereof, for <br />the same compensation as the Contractor was receiving for the services during the expired term immediately <br />preceding the extension, The City may terminate such extension at any time for any reason without prior notice. <br />
The URL can be used to link to this page
Your browser does not support the video tag.