My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-24-19 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2019
>
06-24-19 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:37:21 PM
Creation date
7/25/2025 11:43:47 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
6/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Information Request for: Project G <br />f,"am,cl,N011auM INCIENTMESSIERVtOES. V,_V,_C <br />1 Please confirm the NAICS/ SIC code for the company and/or this specifc projectloperation 325110 <br />4 <br />'lease provitle a general description of the oroiect (i.e. what Nce of pas ion will this bewhat orotluctlsl will be consumedtorodu dlstoredtsold. marketslcustomers served. etc.l <br />hhe new petrocY en cal plan ill bock -in-clac .Y iology and berefrt it,,, a ... c, to I- t feed,tock arder erpy iron=Yale pa, a, well as ar excellen t ;tn ctr re. Ryrerenoroner, the precrr=or to a aarietyf Glsticsal other pr,rh,tc I, then i prodtctto be sold. the <br />naln feedstocks for the new plant are primarily oil and natural gas -based benzene and ethNene. <br />Estimatetl <br />Construction Construction Begin Operations <br />b Please provitle project timeline: Start MMIYY Com eta MMIYY MMIYY <br />113 2020 01 2023 113 2023 <br />7 Please ii the construction lb.doetrelated tothe r ect if lease lease note in include annual lease <br />CATEGORY <br />TOTAL NEW <br />INVESTMENT <br />PORTIONOF <br />INVESTMENT <br />SUBJECT TO VU TAX <br />DESCRIPTION OF PROPERTY <br />Cost of Lan <br />Cost of Bel l ding/Structures (Raal Property): <br />Cost of Machinery B Equipment (please describe): <br />Cost of Engineering: <br />Cost of Construction: <br />Other (catalyst, misc. chemicals, start-up costs): <br />TOTAL <br />the reu red land for the r osed locations are oNmedb IN EOScoma s. the Intention I,to lease the land for use <br />$ 5000.000 <br />326000000 <br />Includes r lent r feedstock Intemiedmte tin )shed roduct storaceand otrier loristics lnlrastrucW re <br />$ 83000.000 <br />3,117000000 <br />1, des cost to construct and Install all or lent and structures. <br />$ 211000.000 <br />040 000 000 <br />8 Utility Needs: Please provitle the estimatetl annual utility usage requirements and estimatetl capital cost to installlpa-ide service tothe site (company portion only). <br />CO <br />Water: <br />ST TOINSTALL <br />$ 200000 <br />ANWALUSAGE <br />12001NIN rals/r (gallons) MM=mil- <br />Sewer: <br />.' 100000 <br />(vdume) <br />Electric: <br />$ 300000 <br />t41NIN kw-hr/r (kwh/kw) <br />Natural Gas: <br />100000 <br />1281NINSCf/ r <br />nn <br />Telecommunications: <br />T5D <br />T5D <br />9 Please provitle estimated annual spending on the following utilities (i.e. nnanil bill) <br />Water El ectricit Telecom <br />Natural Gas <br />2023 $ 410 t39 $ 12828t5 <br />HU <br />1 8214tt <br />.' 3,965 t51 <br />28126951 <br />2021, <br />$ 821477 <br />$ J,965 t51 <br />$ 28126951 <br />2026 <br />$ 821477 <br />$ 3,g65 t51 <br />28126951 <br />2020 <br />2021 2022 <br />10 Esti rated number of construct' on workers per year 410 <br />li3 1518 <br />11 Average wages of construct' on workers $110000/ It <br />$110050/ r $110000/ r -) $55/hr <br />12 Total anticipated full-time employees at the proposed site before and after project completion: <br />Direct Em eas GIVL1' <br />Contract Em loyees. Ie. g. full-time ban <br />an <br />an <br />ut not direct employees) <br />2021 0 <br />cur ent/existing headcount <br />0 , ent/existing headcount <br />2022 <br />21 <br />net new jobs to be added in this year <br />0 net new contract jobs to be added in this year <br />2020 <br />53 <br />net new jobs to be added in this year <br />0 net new cont,actjobs b be added in this year <br />2024 <br />0 <br />net new jobs to be added in this year <br />0 net new cont,ect jobs to be added in this yes, <br />2025 <br />0 <br />net new jobs to be added in this yea, <br />0 net new conhect jobs to be added in this yea, <br />13 What is the average annual salary of the new tlirect employees (without benefits)? Provide a breakdown by job category. <br />EMPLOYEES <br />PER AVGANNUAL <br />TOTALANNUAL <br />Msnagement/Supervisory: <br />Engineer/Operations <br />Operatorii istics <br />Maintenance <br />Safety/EnA ronmentallOC <br />IT/Security <br />Acctg/Admin/Purchasing <br />Totals for plant: 1 741 $ 111,550.0 <br />14 Please checkwhich benefits will be offeredtoen loyees <br />%paid by %paid by <br />YES NO EMPLOYER EMPLOYEE <br />Medical: <br />Den aI: <br />Vision: <br />401(k): <br />401(k) Match: <br />Life insurance: <br />Flexible spending: <br />Short-term I Long-term disability: <br />10 Please provitle a brief description of the technical training requirements, if any, for new direct employees at the site <br />EmployeelPosition I11: 0 erators. to <br />ntics. Iaintenance and 11G <br />Description of Training: T .Y cal train lrr for eacY ob role botY cla,=roon ar dt eld Lora to' <br />natal 6-12 montr' nd start-u .Total co=t of trar r. b mid s ,'4800000. <br />Cost per Employee: post neulvalenta rox. to$100.000 e mlo'e- based on estimated duration of env foment durinq prr andstal-t <br />EmployeelPosition121: <br />Description of Training: <br />Cost per Employee: <br />16 What is the eat matetl annual end n d ract employee training, if any <br />2022 .... <br />2020 $ 250 000.00 , <br />2024 500 000.00 <br />2025 $ 500 000.00 <br />Amount Descri ion of Material <br />19 Amount(number,weigh, or dollar) ofrawmaterial imported arnnillyfor production 8,95050 metric tons of Fi7111, e and Ethylene raw material to be sourced domestically andlrom overseas <br />oesari tion of myento <br />18 Estimatetl average value ofinyentory-hand tat full operations): $ 35.000. 000.00 mate vat ue of inventor onhandreu irement, for tin )shed prolkIlt SINintermediate prolkIlt and raw material benzene <br />19 What percentage of your inventory will leave the state within 175 days? $ 33,950,000 00 1117ok - _ - - <br />In -state Out-of-state Descri ionlT of Sales <br />20 Estimatetl annual sales: 1031.00 hellion US dollars In revenu e. Al roduct n taneted to be sold on an ex -work basis to our customers eae e and commerical transfer of sale will take lace at the dant <br />
The URL can be used to link to this page
Your browser does not support the video tag.