My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-22-19 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2019
>
07-22-19 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:40:36 PM
Creation date
7/25/2025 11:43:50 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
7/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
July 2, 2019 <br />Mr. Ray Mayo <br />Assistant Director of Public Works <br />City of La Porte, Texas <br />2963 N. 23rd Street <br />La Porte, TX 77571 <br />Re: Letter of Recommendation <br />Hillridge Water Plant Improvements Project — Phase It <br />City of La Porte, Texas <br />City Bid #19015 <br />HDR Job No. 16-064 / 19-014 <br />Dear Mr. Mayo: <br />On June 25, 2019, the City received six (6) bids for the above referenced project. The following is a <br />summary of our bid evaluation, <br />Bid Tabulation Sheet — Six (6) construction firms, participated in the bidding process. Each bid was <br />checked for mathematical errors and/or bid irregularities. Errors were discovered on three of the bids. <br />Appropriate corrections to the errors were made and included in the attached bid tabulation. The <br />errors did not affect the order of the bids. <br />The project was bid with Base Bid items, Supplemental Items, and Cash Allowance Items. The Base <br />Bid included the construction of a 50'x20' Precast Concrete Booster Station Building and the <br />installation of the chlorine disinfection system and the electrical system. Cash Allowance Items were <br />included for electrical service and controller programming. <br />The corrected bid totals for the project received from the six firms are as follows: <br />Contractor <br />Total Bid Amount <br />W.W. Payton Corporation <br />$1,075,000.00 <br />R&B Group, Inc. <br />$1,103,375.00 <br />Sustanite Support Services, LE <br />$1,112,500.00 <br />B5 Construction Company, Inc. <br />$1,168,899.00 <br />Black Castle General Contractor <br />$1,250,080.00 <br />Resicom, Inc. <br />$1,752,174.00 <br />A copy of the bid tabulation is attached in Section I of this report. <br />TeleRhone Conversations with References — HDR contacted references provided by the lowest <br />responsive bidder, W.W. Payton Corporation, and asked them to respond to a questionnaire. HDR <br />received overall good ratings on their previous projects of similar size and nature. The references <br />4828 Loop Central Drive, SLAG 800, Houston, TX 77081-2220 <br />T (713) 622-9264 F (713) 622-9265 <br />Texas Registered Engineering Finn F-754 <br />
The URL can be used to link to this page
Your browser does not support the video tag.