My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-22-19 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2019
>
07-22-19 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:40:36 PM
Creation date
7/25/2025 11:43:50 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
7/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of La Porte <br />GecUon0041O <br />Bid Form <br />BID FORM <br />BID 19015-HILLRIDGE WATER PLANT IMPROVEMENTS PHASE II -REBID <br />W.W. <br />p�-vtoO�q[�Or8t�/D <br />Bid of Payton anindividual proprietorship, acorporation organized and existing <br />under laws ofthe State ofTexas, .for the HiUhdge <br />Water Plant Improvements Phase 11, for the City of La Porte, Harris County, Texas. <br />The undersigned bidder has carefully examined the Instructions tuBidders, this Pnopnoe|. the (3anens| <br />Conditions of Agreement, the Technical Specifications and the drawings for the work herein above <br />described and referred to in the Invitation to Bid and has carefully examined the site of the work and will <br />provide all necessary labor, ouperintendenoe, maohinery, equipment, tools, moterie|a, services and other <br />means ofconstruction tocomplete all the work upon which he bids, aocalled for inthe Contract, the <br />Specifications and shown on the drawings, and in the manner prescribed therein and according to the <br />requirements ofthe City ofLaPorte. <br />TOTAL BASE BID <br />VVrtte /O'�r � <br />It is understood and agreed that the work shall be complete in full within 350 calendar days after the date <br />onwhich work iatobecommenced aoestablished bythe Contract Documents. <br />It is agreed that the contract price may be increased or decreased to cover work added urdeleted by order <br />of the Engineer, in accordance with the provisions of the General Conditions of Agreement. <br />The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty <br />(60) days following date of bid opening. <br />It is understood that the bid security accompanying this proposal nho| be returned to the undersigned <br />un|eaa, in case of the acceptance of this proposal the undersigned should fail to enter into e construction <br />contract and execute bonds as provided in the specifications. In the event the undersigned should fail to <br />enter into a construction contract and execute bonds as required within 14 calendar days afterthe Engineer <br />has given unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be <br />forfeited to the Owner and ohoU be considered as payment for damages duo to delay and other <br />inconveniences suffered by the Owner as a result of such failure on the part of the undersigned. <br />
The URL can be used to link to this page
Your browser does not support the video tag.