My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-09-19 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2019
>
12-09-19 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 1:44:03 PM
Creation date
7/25/2025 11:44:48 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
12/9/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Additional Scope of Work Comments: <br />In this technique, total compensation due to the <br />owner arises from two sources: the actual acquisition (both land and improvements), plus diminution (damages) and cost to cure items, <br />if any, to the remainder as a result of the acquisition and/or the project. This is called the before and after scenario. In order to estimate <br />compensation an appraisal of the whole property and the remainder is necessary. This valuation involves a hypothetical conditionin <br />both cases. When appraising the whole property, the impact of the project is ignored. When appraising the remainder after the <br />acquisition, a forecast is being made. These hypothetical conditionsare accepted appraisal procedures when valuing eminent domain <br />situations. <br />We have not discussed the subject property or project with the landowners. <br />In the event there are improvements on the subject property, an analysis of the project impact on the improvements will be examined. <br />If the improvements are not adversely affected by the proposed acquisition/project, then the valuation of the improvements is not <br />necessary to produce credible valuation results. The subject property is owned by the City of La Porte and is used as the La Porte IJ <br />Kibodeaux Memorial Public Works Service Center, the La Porte Recycling Center, and the La Porte Fire Department Training Facility. The <br />subject property is improved with multiple administrative office buildings, metal buildings, and supporting site improvements. In this <br />case, the subject improvements are not impacted by the project and have not been appraised. Even if the improvements were valued <br />in this report, their valuation would not change our opinion of total compensation. The subject property has been appraised as <br />effectively vacant land. <br />It is assumed that any minor improvements, such as fencing, gates, roads, irrigation, equipment, or personal property items that are <br />impacted by the proposed acquisition will be restored or replaced to equal or better condition as before. Accordingly we have not <br />included any compensation for their replacement. Additionally, we have not included any crop or pasture replacement costs as these <br />items will be addressed by the client. <br />This appraisal does not include or consider the mineral estate. <br />Engineering studies, ADA determinations, surveys, title reports, flood plain determinations, and environmental audits are beyond the <br />scope of this appraisal. <br />We have also utilized aerials and topographical maps of the subject whole property and surrounding areas to obtain additional details <br />regarding the subject property and partial acquisition. <br />There are two existing CenterPoint Energy (formerly Houston Lighting & Power Company) electric transmission line easementsand <br />multiple existing pipeline easements on the subject property. In the before scenario, the valuation of the subject whole property does <br />not separate the existing easement areas from the rest of the property, and the area encumbered by the existing easements has not <br />been discounted. We have considered the presence of the existing electric transmission line easements and existing pipelines while <br />determining the rights acquired by the proposed acquisition as well as the impact that the proposed acquisition and project will have <br />on the remainder property. The proposed acquisition consists of wide pipeline easement and springing temporary workspace <br />easement. The acquisition parallels the pipelines and the electric transmission line easements across the property. <br />HYPOTHETICAL CONDITIONS & EXTRAORDINARY ASSUMPTIONS <br />Hypothetical Conditions: (A hypothetical condition is a condition, directly related to a specific assignment, which is contrary to what <br />is known by the appraiser to exist on the effective date of the assignment results, but is used for the purpose of analysis. The use of <br />hypothetical conditions may affect the assignment results.) <br />This valuation involves a hypothetical condition in both the before and after scenarios. When appraising the subject whole property, <br />the impact of the project is ignored. When appraising the remainder property after the acquisition, a forecast is being made. These <br />hypothetical conditions are accepted appraisal procedures when valuing eminent domain situations. <br />Extraordinary Assumptions: (An extraordinary assumption is an assignment-specific assumption as of the effective date regarding <br /> The use of <br />extraordinary assumptions may affect the assignment results.) <br />None <br /> <br />Allen, Williford and Seale, Inc. Page 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.