My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-09-19 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2019
>
12-09-19 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 1:44:03 PM
Creation date
7/25/2025 11:44:48 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
12/9/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VALUATION OF PART TO BE ACQUIRED <br />Description of Partial Acquisition: The proposed acquisition consists of a permanent pipeline easement and a springing <br />temporary workspace easement. The permanent pipeline easement has a centerline length of 1,075.51 feet, has a width of 16inches, <br />and contains a total of 0.034 acre (1,486 SF) of land. The proposed pipeline easement parallels existing pipelines and electric <br />transmission line easements across the easternmost portion of the subject property. The springing temporary workspace easement <br />consists of the re-occurring right to use a 30-n both sides of the pipeline) adjacent to the proposed <br />pipeline for the purpose of any subsequent maintenance, inspection, replacement, repair and/or removal of the pipeline. The survey <br />exhibit indicates the springing temporary workspace easement contains 0.70acre (30,492SF). Please refer to the survey exhibit in the <br />addenda for further details on the location of the proposed permanent pipeline and proposed springing temporary workspace <br />easement. <br />Improvements Located Within the Partial Acquisition That Require Valuation: None <br />Highest and Best Use of Part to be Acquired: T <br />property. As such, the highest and best use of the partial acquisition, as vacant, is for use in conjunction with the subject whole property. <br />Valuation of Partial Acquisition: (Land Only) <br />springing temporary workspace <br />easement. Acquiring all rights to the easement areas will not be necessary. Based on the use to which the easements will be put and <br />the property rights imposed by the taking of the proposed easements, an appropriate percentage deduction to the previously concluded <br />fee simple value of the property is necessary. We have estimated the value of the acquisition based on the impact on the subsurface, <br />surface, and air right estates for the subject property. The rights being acquired by the proposed easements are considered less than <br />the total underlying land value. The subject property has multiple pipelines and electric transmission lines. Based on the title work, the <br />acquisition parallels the pipelines and two electric transmission line easements across the property. We have considered the presence <br />of the existing electric transmission line easements and existing pipelines while determining the rights acquired by the proposed <br />acquisition. We have estimated the rights acquired by the proposed pipeline easement to represent 99% of the fee-simple value and <br />the rights acquired by the proposed springing temporary workspace easement to represent 20% of the fee-simple value in the area <br />encumbered by the proposed easements. The value of the partial acquisitions, land only, is calculated as follows: <br /> <br />% of Value <br />Partial Acquisition: Area Per Unit Value <br />Acquired <br />Pipeline Easement 1,486 SF @ $3.75 per SF @ 99% = $ 5,517 <br />Springing Temporary Workspace Easement 30,492 SF @ $3.75 per SF @ 20% = $ 22,869 <br /> <br /> <br /> <br /> <br />Land Total $ 28,386 <br /> <br />Contributory Value of Improvements Within Partial Acquisition (If Required): <br />Itemized Improvements <br /> $ <br /> $ <br /> $ <br /> $ <br />Total Value of Improvements Within Partial Acquisition $ 0 <br />Total Valuation of Partial Acquisition <br />The value of the partial acquisition consists of the value of the land and any improvements located within the partial acquisition that <br />require valuation. The total value of the partial acquisition, land and improvements is calculated as follows: <br />Partial Acquisition (Land Value) $ 28,386 <br />Partial Acquisition (Improvements) $ 0 <br />2 <br />Total Value of Partial Acquisition $ 28,386 <br /> <br />Allen, Williford and Seale, Inc. Page 7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.