My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-14-20 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2020
>
12-14-20 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2022 12:25:06 AM
Creation date
7/25/2025 11:46:37 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
12/14/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Appropriation <br />Agenda Date Requested:December 14, 2020 <br />015General CIP <br />Source of Funds: <br />Requested By:Rosalyn Epting, Director <br />Department:Parks & Recreation <br />015-8080-552.80-02 <br />Account Number: <br />$523,950 Budgeted <br />ReportResolutionOrdinance <br />$492,170 Remaining <br />Amount Budgeted: <br />N/A <br />Amount Requested: <br />Exhibits:Bid Access Report, Bid Tabulation <br />Budgeted Item:YesNo <br />SUMMARY& RECOMMENDATION <br />Bid #21002 for the Northwest Park Soccer Field LightingRenovation Project was <br />opened and read on October 27, 2020. Twenty-eight (28) vendors downloaded the bid <br />packet and four (4) bids were received. The Notice to Bidders was advertised in the <br />Bay Area Observer on October 8 and October 15, 2020, as well as posted on Public <br />. The Bid Access Report and Bid Tabulation are <br />attached. <br />The budget for this project is as follows: <br />BUDGET <br /> Project Estimate$499,000 <br /> 5% Contingency$ 24,950 <br />Total Budget for Northwest Park Lighting$523,950 <br />EXPENSES TO-DATE <br /> Contract Engineer$31,780 <br />REMAINING BUDGET$492,170 <br />The lowest bid received was$498,469, which is over budget by $6,299. Staff is working <br />with ourcontract engineer, Huitt-Zollars, to make changes to the plans in aneffort to <br />lower the cost of the project. The original design placed a lot of restraints on vendors <br />due the specified system, which resulted in those vendors not submitting bids. For the <br />new design, the previous design elements of galvanized steel poles, LED light fixtures, <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.