Laserfiche WebLink
INTERLOCAL AGREEMENT <br />This Interlocal Agreement ("Agreement") is entered into by and between Harris County <br />("County") and City of La Porte, Texas ("City") pursuant to the interlocal Cooperation Act, Tex. Gov't <br />Code Ch. 791.001, et seq. County and City may each be referred to herein individually as a "Party" or <br />collectively as the "Parties." <br />RECITALS <br />WHEREAS, it is to the mutual benefit of the Parties to construct traffic improvements along the <br />Fairmont Parkway corridor between Beltway 8, in Pasadena, Texas and South 7Ih Street in LaPorte, Texas <br />("Project"); <br />WHEREAS, the City has appropriated $1,000,000.00, an agreed contribution towards the cost of <br />construction of the Project ("Initial Funding"); <br />WHEREAS, the Project will be constructed in two phases; <br />WHEREAS, the first phase of the Project ("Phase 1") consists of construction of intersection <br />modifications and installation of temporary signals at the modified intersections, along Fairmont Parkway <br />from Cunningham Drive to South 7°i Street; <br />WHEREAS the construction of Phase 1 of the Project is substantially complete; <br />WHEREAS, the second phase of the Project ("Phase 2") includes installation of permanent signals <br />at various intersections, construction of new signals, signal rebuilds, signal modifications, signal timing <br />changes, and fiber optic interconnection of the traffic signals along the Project corridor; <br />WHEREAS, the County has entered into an Advance Funding Agreement ("AFA") with the Texas <br />Department of Transportation ("TxDOT") for Phase 2 of the Project, under which TxDOT will be <br />responsible for providing Federal funding for 80% of the construction cost, and the County shall be <br />responsible for funding the remaining 20% of the construction cost ("Local Cost"); <br />WHEREAS, Harris County Commissioners Court finds that the Project serves a public purpose. <br />NOW, THEREFORE, for and in consideration of the mutual covenants, agreements and benefits to <br />the parties herein named, it is agreed as follows: <br />TERMS <br />I. Responsibilities of the Parties <br />A. The County has provided or caused to be provided, all engineering and related services necessary <br />to prepare plans, specifications and estimate ("PS&E") for construction of both Phase 1 and Phase <br />2 of the Project, at no cost to the City. <br />B. During construction of Phase 1 and Phase 2 of the Project, County will: <br />i. Manage and inspect the construction of the Project; and <br />ii. Through its contractor, construct Phase 1 of the Project in accordance with the PS&E <br />approved by the City and Phase 2 of the Project in accordance with the PS&E approved by <br />TxDOT. County Engineer may make minor changes in either PS&E through change(s) in <br />contract ("CIC") that he deems necessary or desirable. <br />