Laserfiche WebLink
C��LaP�te <br />Genrg Electrical Solutions ULC <br />Bid of dba Leggio Electric <br />Sec4lon010410 <br />BidFonn <br />December14, 2021 <br />DATE: <br />anindividual proprietorship, acorporation organized and existing <br />under laws of the State of Texas,opartnership consisting of Bradley Page and Rodney �� for the <br />Broadway Trail Lighting Project -Phase 11 for the City of La Porte, Harris County, Texas. <br />The undersigned bidder has carefully examined the Instructions to Biddem, this Proposal, the General <br />Conditions of Agreement, the Technical Specifications and the drawings for the work herein above <br />described and referred to in the Invitation to Bid and has carefully examined the site of the work and will <br />provide all necessary labor, superintendenoe, mouhinery, equipment, tools, matehe|e, services and other <br />means of construction to complete all the work upon which he bida, as called for in the Contract, the <br />Specifications and shown on the drawings, and in the manner prescribed therein and according to the <br />requirements ofthe City ofLaPorte. <br />Total Lump Sum <br />Written **Four Hundred twenty-six thousand eight hundred twenty-five and no/1 00 dollars" <br />It is understood and agreed that the work shall be complete in full within 195 calendar days after the date <br />onwhich work istobecommenced @s established bythe Contract Documents. <br />It is agreed that the contract price may be increased or decreased to cover work added or deleted by order <br />of the Engineer, in accordance with the provisions of the General Conditions of Agreement. <br />The undersigned agrees that the amounts bid inthis proposal will not bewithdrawn mmodified for sixty <br />(60) days following date of bid opening. <br />It is understood that the bid security accompanying this proposal shall be returned to the undersigned <br />un|eam, in case of the acceptance of this proposal the undersigned should fail to enter into e construction <br />contract and execute bonds anprovided inthe specifications. |nthe event the undersigned should fail to <br />enter into a construction contract and execute bonds as required within 14 calendar days after the Engineer <br />has given unsigned contracts tothe ContnauLor, it is understood and agreed that the bid security shall be <br />forfeited to the Owner and shall be considered as payment for damages due to delay and other <br />inconveniences suffered by the Owner as a result of such failure on the part of the undersigned. <br />