My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-14-22
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2022
>
02-14-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2022 11:39:33 PM
Creation date
7/25/2025 11:49:46 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
2/14/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Appropriation <br />Agenda Date Requested:February 14,2022 <br />Requested By:Ray Mayo, Director Source of Funds: <br />Department:Public Works <br />Account Number: <br />Amount Budgeted:$ 0 <br />ReportResolutionOrdinance <br />Amount Requested:$99,095.00 <br />Exhibits:Consultant Proposal for Utility Relocations, <br />Budgeted Item:YesNo <br />Project estimate, Conflict Listing <br />SUMMARY& RECOMMENDATION <br />Texas Department of Transportation (TxDOT) intends to provide drainage <br />improvements in conjunction with the wideningof State Highway 146 from Spencer <br />Highway to Red Bluff.Multiple water and sewer lines cross the Highway 146 corridorin <br />this section. Four (4) of these have been determined to have a conflict with the <br />proposed drainage improvements. Two (2) of these conflicts will require the pipes to be <br />relocated at deeper depths to avoid the conflict. The two (2) remaining conflictsare able <br />to remain in place, but will require a concrete encasement to protect the utility. <br />Cobb Fendley,has been involved in many phases of the TxDOT 146 widening and has <br />provided a proposal for design and coordination of utility agreements to meet TxDOT <br />requirements. This scope of this work was notavailable during the budget planning <br />process. Funds can be appropriated by a budget amendment.To minimize cost, <br />disruption to traffic flow, and delays to the widening project, construction work to <br />address the utility conflicts will be conducted in conjunction with the widening project. <br />ATxDOTcontractorwill perform the work and the City will have input and oversight of <br />the work specific to the utility lines.An agreement will be negotiated for the actual <br />construction costsand fundswill be programmed for the FY 22-23 budget.Construction <br />costs are currently estimated at $782,520.00 <br />Staff recommendsapproval of a budget amendment andacceptance of the proposal <br />from Cobb Fendley to provide these professional engineering services for the City of <br />La Porte. <br />Benefits: <br />Design efforts can be accomplished in a suitable timeframe. <br />Construction efforts can be combined into the highwayimprovement project. <br />Liabilities: <br />Conflict information was not available during budget planning process. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.