My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-28-22
LaPorte
>
.Agendas
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2022
>
03-28-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2022 6:38:06 AM
Creation date
7/25/2025 11:50:02 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Appropriation <br />Agenda Date Requested:March 28, 2021 <br />Requested By:Ray Mayo, Director Source of Funds:032-Grant Fund <br />Department:Public Works <br />Account Number:032-7087-532-1100 <br />Amount Budgeted:$200,000 <br />ReportResolutionOrdinance <br />Amount Requested:$200,000 <br />Exhibits:Proposal from Alfa Laval Inc., <br />Budgeted Item:YesNo <br />Sole source letter, ARPA Information <br />SUMMARY& RECOMMENDATION <br />The Wastewater TreatmentPlant belt filter press re-conditioning project was started in <br />FY21, as a multi-year projectwhen belt press #1 was re-conditioned by the <br />manufacturer as a sole source contractor. This optionwas found to be a significant cost <br />savings in comparison to total equipment replacement.In April of 2021 the single bid <br />amount provided for total replacement was $518,113.52.This bid was rejected in favor <br />of the re-condition option. <br />In FY22 this project will be completed with the re-conditioning of belt press #2.The <br />FY22 portion of the project was also identified to be funded using American Rescue <br />Plan Act (ARPA) funds. <br />The scope consists of part replacementonthebelt filter pressunit with new factory <br />parts, . This offer includes an <br />extended warranty on high wear parts; a three (3) year warranty on 18 rollers and a two <br />(2) year warranty on 36 bearing assemblies. The proposed cost to re-conditionthe belt <br />press is $198,320.00.Replacement of allmoving and wearparts will provide an <br />expected service life equal to a new unit. The Purchasing Department has reviewed the <br />proposal and has approved Alfa Laval as a sole-source contractor. <br />Staff recommendsapproval of the re-conditioning proposaloffered by Alfa Laval Inc. <br />with a cost of $198,320.00as a sole source contractor and a project contingency of <br />$1,680.00. The scope of the project replaces all moveable and wear parts, therefore a <br />larger contingency amount is not required. <br />Benefits: <br />Option to rebuild will save significant costs over total replacement. <br />Service life is expectedto be equal to a new unit. <br />Extended warranty on high-wear parts. <br />Liabilities: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.