Laserfiche WebLink
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Appropriation <br />Agenda Date Requested:March 28, 2021 <br />Requested By:Ray Mayo, Director Source of Funds:032-Grant Fund <br />Department:Public Works <br />Account Number:032-7087-532-1100 <br />Amount Budgeted:$200,000 <br />ReportResolutionOrdinance <br />Amount Requested:$200,000 <br />Exhibits:Proposal from Alfa Laval Inc., <br />Budgeted Item:YesNo <br />Sole source letter, ARPA Information <br />SUMMARY& RECOMMENDATION <br />The Wastewater TreatmentPlant belt filter press re-conditioning project was started in <br />FY21, as a multi-year projectwhen belt press #1 was re-conditioned by the <br />manufacturer as a sole source contractor. This optionwas found to be a significant cost <br />savings in comparison to total equipment replacement.In April of 2021 the single bid <br />amount provided for total replacement was $518,113.52.This bid was rejected in favor <br />of the re-condition option. <br />In FY22 this project will be completed with the re-conditioning of belt press #2.The <br />FY22 portion of the project was also identified to be funded using American Rescue <br />Plan Act (ARPA) funds. <br />The scope consists of part replacementonthebelt filter pressunit with new factory <br />parts, . This offer includes an <br />extended warranty on high wear parts; a three (3) year warranty on 18 rollers and a two <br />(2) year warranty on 36 bearing assemblies. The proposed cost to re-conditionthe belt <br />press is $198,320.00.Replacement of allmoving and wearparts will provide an <br />expected service life equal to a new unit. The Purchasing Department has reviewed the <br />proposal and has approved Alfa Laval as a sole-source contractor. <br />Staff recommendsapproval of the re-conditioning proposaloffered by Alfa Laval Inc. <br />with a cost of $198,320.00as a sole source contractor and a project contingency of <br />$1,680.00. The scope of the project replaces all moveable and wear parts, therefore a <br />larger contingency amount is not required. <br />Benefits: <br />Option to rebuild will save significant costs over total replacement. <br />Service life is expectedto be equal to a new unit. <br />Extended warranty on high-wear parts. <br />Liabilities: <br /> <br />