My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-09-18 Drainage and Flooding Committee Meeting
LaPorte
>
.Agendas
>
Open Meetings
>
Drainage and Flooding Committee
>
Drainage Committee
>
2018
>
07-09-18 Drainage and Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:01:16 PM
Creation date
7/25/2025 11:51:55 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
Date
7/9/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2) A section will be widened by approximately loft to provide additional conveyance. (See <br />Figure 11). <br />3) An existing 12" culvert will be upsized to 24" at the downstream end of the northern linear <br />detention. <br />IN <br />Channel" Widenling, Ditch egrnent 1 <br />..................Flrcjpapd-Exktlirng <br />100 -80 -60 -40 -20 0 20 40 60 90 104E <br />Sta�� rr (rrb <br />Figure 11 Widened Ditch Geometry <br />The proposed ditch and culvert improvements are shown in Exhibit 9. <br />1..:.lydrofogs c An alysn s <br />No changes were made to hydrologic parameters from the existing model as there are no significant <br />anticipated land use changes. <br />Hydraulic Analysis - La Porte Airport property <br />The existing XPSWMM model was updated to reflect proposed changes to structures and ditches. <br />With the proposed improvements the La Porte Municipal Airport satisfies the FAA requirements <br />while improving drainage conditions to the neighboring communities. <br />During the 10-year storm event, the proposed improvements contain flow within the ditches. <br />Though some overtopping occurs at the west side of the airport (along Farrington Road), flooding <br />conditions are significantly improved. During the 5-year event flow is mostly contained within <br />the roadside ditch along the western drainage ditch with a minimal impact at the south most end. <br />La Porte Municipal Airport — Offsite Drainage Analysis <br />HT&J, LLC, January 2018 Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.