My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-09-18 Drainage and Flooding Committee Meeting
LaPorte
>
.Agendas
>
Open Meetings
>
Drainage and Flooding Committee
>
Drainage Committee
>
2018
>
07-09-18 Drainage and Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:01:16 PM
Creation date
7/25/2025 11:51:55 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
Date
7/9/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C�mv <br />PEs <br />2) The ditch segments 15, 18, 38, and 177, were widened to provide additional <br />conveyance. These segments were widened by approximately 10 ft. (See Figure 9). <br />The flowline of these segments is not altered. <br />channed wkjerflrlpm, Ditch ",ocep <br />3 rn (-- n t 1, 5 <br />V r,c, w" d a 01 u !J 41 <br />?,I <br />1(,0 80 W") 40 2 (11 0 40 (10 HO I (A <br />StMhun (H) <br />FIGURE 9 —WIDENED DITCH GEOMETRY <br />Chann0 Mdenk-%,, Mtch: Segment 1,29 <br />.... . ........ LnkiflAdV, <br />100 <br />a R 4) P 4 (dt <br />FIGURE 10 -WIDENED DITCH GEOMETRY ALONG FARRINGTON ROAD <br />Page 127 <br />
The URL can be used to link to this page
Your browser does not support the video tag.