IML <br />FIGURE 13 - POTENTIAL PIPELINE CONFLICTS <br />Discussions with Don Pennell will lead to design of drainage across the pipeline corridor <br />being set to avoid the pipelines, rather than relocating the pipelines. This will include inlet <br />structures on each side of the corridor, with a bored conduit sized to carry flow beneath all <br />the pipelines. The expected flowline will be below any drainage ditch flowline, but the inlets <br />will have access to allow for periodic de -silting of the structures. <br />6. Conclusions and Recommendations <br />By following the discussion of the design for each of the items listed for evaluation, the total <br />estimated construction cost for the project is in excess of $3.5 Million. This is far beyond the <br />programmed level of funding. However, the removal of components of the project will help <br />reduce the cost to bring it closer to budget. Therefore, the listing below removes a major <br />item, and removes components of two other items to reduce costs. <br />6.1. PAVEMENT REHABILITATION <br />The project as described above, but with the removal of the reconstruction of the western <br />portion of Taxiway A is recommended. Also, while desirable but not necessary, the spray <br />Page 132 <br />