07-09-18 Drainage and Flooding Committee Meeting
LaPorte
>
.Agendas
>
Open Meetings
>
Drainage and Flooding Committee
>
Drainage Committee
>
2018
>
07-09-18 Drainage and Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:01:16 PM
Creation date
7/25/2025 11:51:55 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
Date
7/9/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IML <br />Another possible alternate is to include the apron surface spray treatment. It may be <br />possible that if good pricing is provided during bid, that room in the funding may allow for the <br />seal coat. <br />A final possible alternate could be to provide additional work in the linear detention areas. <br />Such additional work will provide more detention and ultimately get the airport closer to the <br />"goal" of the drainage improvements that are identified as needed in this report. <br />7. Schedule <br />Based on the scale of the project, with the expectation that phasing will limit the closure of <br />both runways at the same time, along with other limitations on phasing of the apron <br />rehabilitation due to need for parking of aircraft, it is expected that the schedule of the <br />project will be slightly longer than normal due to phasing and re -mobilization for certain <br />construction activities (like pavement milling for patching). Given this, the expected <br />timeframe for construction schedule is likely to be between 10 months and 1-year overall <br />duration. The expectation is that the project will not bid until funding is provided for FY 2019 <br />construction, which is usually in the spring. Therefore, the project schedule will likely follow a <br />July 2019 to May 2020 timeframe. If the possibility of moving the project into FY18 becomes <br />a reality, the timeframe would move up 1 year to 2018-2019. Accommodations to accelerate <br />the construction schedule can be made, but the pricing provided in the estimate is based on <br />a standard construction schedule so some additional cost for acceleration would need to be <br />accommodated for if a quicker schedule is desired. <br />8. Cost Estimates <br />The cost of the project as recommended is listed below: <br />TABLE 6 — PROJECT ESTIMATE OF PROBABLE CONSTRUCTION COST <br />The pavement is patched, crack sealed, and <br />surface treated. Edges are regraded. <br />Taxiway markings are replaced. <br />The pavement is surface treated. Edges are <br />regraded. Taxiway markings are replaced. <br />Page 134 <br />