My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-09-18 Drainage and Flooding Committee Meeting
LaPorte
>
.Agendas
>
Open Meetings
>
Drainage and Flooding Committee
>
Drainage Committee
>
2018
>
07-09-18 Drainage and Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:01:16 PM
Creation date
7/25/2025 11:51:55 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
Date
7/9/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IML <br />mandatory signs with standard holdlines (150/5340-18F) is not possible due to the <br />existing taxiway offset from the runway. Correcting this issue is not cost-effective as <br />it also requires the changes listed in 1. above. <br />3. For limited asphalt pavement patching, use of FAA specification P-403 with state <br />highway specification normally needs a modification for the rated weight limits as <br />listed in the ALP. However, the draft -1 OH standard specifications sets a tonnage <br />limitation of 3000 tons where the state specification can be used instead (as a repair <br />project — which this is). If this draft specification is finalized and issued prior to <br />bidding, the use of a modification will not be needed. <br />Page 136 <br />
The URL can be used to link to this page
Your browser does not support the video tag.