My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-14-20 Drainage and Flooding Committee Meeting
LaPorte
>
.Agendas
>
Open Meetings
>
Drainage and Flooding Committee
>
Drainage Committee
>
2020
>
12-14-20 Drainage and Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 9:04:25 AM
Creation date
7/25/2025 11:52:13 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
Date
12/9/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROPOSED DRAINAGE IMPROVEMENTS <br />• As part of a planned redevelopment of the Pasadena Convention Center and <br />Fairgrounds site south of W. Fairmont Parkway and on either side of Willow Springs <br />Bayou (Harris County Flood Control Channel B112-00-00), it is the intention of the City <br />of Pasadena to make drainage improvements benefitting all those who depend upon <br />this channel for effective flood control. <br />• Improvements will include provision for at least 100 acre-feet of storm water detention <br />as required to reduce peak event runoff volumes from impervious areas served by the <br />channel. <br />• The Brookglen Subdivision in the City of LaPorte, located immediately upstream of the <br />Pasadena Convention Center and Fairgrounds site, consists of approximately 600 single- <br />family homes. The area has experienced severe flooding, with a number of homes <br />suffering repetitive losses. In its 2009 City Wide Drainage Study (available on the City's <br />web site), the City of LaPorte identified several capital projects directly benefitting the <br />drainage area immediately north of the Pasadena Convention Center and Fairgrounds <br />site. <br />• Based on these substantial potential capital project costs and other engineering studies <br />we believe that reductions in the range of % foot to one foot of the water surface <br />elevation through downstream improvements constructed by the City of Pasadena <br />would have significant financial benefit to the City of LaPorte, both in terms of reduced <br />exposure to flood losses and opportunity to avoid certain capital expenditures. <br />• Pasadena will provide La Porte the necessary modeling information performed by Klotz <br />Associates, Inc. for future LOMR submittal to FEMA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.