My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-25-19 Regular Meeting of the La Porte Development Corporation Board
LaPorte
>
.Agendas
>
Open Meetings
>
La Porte Development Corporation/4B
>
2019
>
03-25-19 Regular Meeting of the La Porte Development Corporation Board
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 11:20:14 AM
Creation date
7/25/2025 11:59:31 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Development Board Corporation/Type B
Meeting Doc Type
Agenda Packet
Date
3/25/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f,":°m,c;1,N011auu°'.I[rw°m.mzNTW SgSI wr"VuCI`S,V,_V,_";", <br />Information Request for: Project G <br />1 Please confirm the NAICS/ SIC code for the company ai,i this specific proje.VW... tion 325110 <br />4 <br />'lease provitle a general iescri raim of the project (i.e. what tvpe of operation will this be what protluctlsl will be consumedlproducedtstoredlsoltl rawketslcustomers served etc.l <br />rhe new petrochemical plant ill use ben -in -class technology and benefit from access to low can feedstock and energy from shale gas as well as an excClent infrastructure Sty—o monomer, the precursor to a variety of plastics and other products, is the main product to be sold. the <br />stain feedstocks for the new plant are primarily or and natural gasbasedbenzene and ethylene <br />Estjmatetl <br />Construction Construction Begin Operations <br />b Please provide project timeline: Start MMIYY Com tete MMIYY MMIYY <br />Q3 2020 Q1 2023 Q3 2023 <br />I Please pa,vide the construction bud trel,ted tothe —iia,t if lease enMe antl include annual lease <br />CATEGORY <br />TOTAL NEW <br />INVESTMENT <br />PORTIONOF <br />INVESTMENT <br />SUBJECT TO VU TAX <br />DESCRIPTION OF PROPERTY <br />Cost MLantl: <br />CostM Buildings Structures (Real Property): <br />CostM Machinery B Equipment (please de ... libel: <br />CostM Engjneerjng: <br />Cost M ConstructI on: <br />Other )catalyst, mI... chemicals, start-up costs): <br />TOTAL <br />$ <br />$ 100000 <br />There wired land for the proposed locations are ownedb INEOS c,m antes. The intention is to lease the land for use <br />5 000 000 <br />Electric: <br />.' 300000 <br />$ 326000.000 <br />14 MM kw-hr/r (kwh/kw) <br />Includes process eg,ipme,to i feedstock intermediatefinished rod-stora eand other Co mics infrastr-me <br />83 000 000 <br />128 MMSCF/r <br />$ 39 000.000 <br />1SD <br />incl a des con to constru ct an d i nstall all processi n a son pm ent an d stru ctu res. <br />29 000 000 <br />9 Please provide estjmatetl annual spending onthefollowing utilitie.(i.e. annual bill) <br />$ 040 000 000 <br />Natural Gas <br />2023 $ 410139 $ 1 982 815 <br />8 Utility Needs: Please provitle the estimatedannual utility usage requirements estjmatetl <br />ents antl capital cost to installlprovjde service to the sit.(company portion only). <br />CO <br />Water: <br />ST TOINSTALL <br />.' 200000 <br />ANJUALUSAGE <br />1200 MM alstr (gallons) MM=million <br />Sewer: <br />$ 100000 <br />(volume) <br />Electric: <br />.' 300000 <br />14 MM kw-hr/r (kwh/kw) <br />Natural Gas: <br />$ 100000 <br />128 MMSCF/r <br />Telecommunications: <br />1SD <br />1SD <br />9 Please provide estjmatetl annual spending onthefollowing utilitie.(i.e. annual bill) <br />Water Electricit Telecom <br />Natural Gas <br />2023 $ 410139 $ 1 982 815 <br />2024 <br />$ 821411 <br />$ 396`.1`.1 <br />$ 28126951 <br />2025 <br />$ 821411 <br />.' 3965151 <br />28126951 <br />2026 <br />$ 821411 <br />$ 3965 751 <br />$ 28126951 <br />2020 <br />2021 2022 <br />10 Estjmatetl number M construction workers per year 410 <br />1618 1518 <br />11 Average wages M const ... tion—kers $110000/r <br />$110000/r $110000/r (D $55Jhr <br />12 Total antjcjpated full-time employees at the proposed site before antl after project completjon: <br />Direct Em es QNL1' <br />0 ur headcountt/existing <br />full-time but not tlirect employees)2021 <br />headcount2022 <br />as. jdisting <br />21 net new jobs to be added in this year <br />contract jobs to be added in this year <br />2020 fi3 net jobbeddd in this year <br />U01e.g. <br />contract jobs to be added in this year <br />2024 0 net new jobs to be added in this year <br />contract jobs to be added in this year <br />2025 0 net new jobs to be added in this year <br />contract jobs to be added in this year <br />13 What js the average annual salary of the new tlirect employees (without benefts)? Provide a breakdown by job category. <br />EMPLOYEES <br />PER AVG ANNUAL <br />TOTAL ANNUAL <br />CATEGORY SALARY Al. HOURLY RATE <br />PAYROLL <br />Management) Supervisory: <br />EngineerlOperations <br />2 . 144 000.00 <br />11 124200.00 <br />288 000.00 <br />1366200.00 <br />OperatorslLogistics <br />Majntenance <br />36 . 124200.00 <br />16 124200.00 <br />4411200.00 <br />1981200.00 <br />Sel EmjronmentallOC <br />3 9E 000.00 <br />288000.00 <br />ITISecurity <br />AmtoAdmini hasjng <br />3 . 84 r- ri <br />3 84000.00 <br />252 000.00 <br />252000.00 <br />Totals forplant: <br />74 111550.00 1 <br />8904600.00 <br />14 Please che.kwhi.h benefits will be offered to employees: <br />%paid by % paid by <br />NO EMP, <br />Medical: <br />Den al: <br />Vjsion: <br />401 (k): <br />401 (k) Match: <br />Life insurance: <br />Flexible spending: <br />Short-term l Long-term disabjljty: <br />15 Please provide a lanef description of the technical training regUremeirl if any, for new direct employees at the site <br />EmployeelPosition 111: O erat ors Lo mics Maintenance and QC <br />Dei ptiwt of Training: Technical traibin for each ob role. both classroom and fieldfora r mate) 6-12 months re and start -u .Total can of traibin be in mid is ox. $4800.000. <br />Cost per Employee: Can iseuival a rox. to$100000 e ��oee-based on asoma' ed duration of em to mentdurins�o andstart-u <br />EmplWeelPosition(2): <br />Descrj ati on of Training: <br />Cost per Employee: <br />11 What I. the est mated annual din on d rect employee tr ng f any <br />2022 2 2 .. 2 2.4 <br />2020 210 000.00 , <br />2024 $ 00 000.00 <br />2025 00 000.00 <br />Amount Oescri ion of Matn al <br />1l Amount (number,weight, or dollar)of rawmaterialimpatetl annuallyfar production 895050 mor dons of Senzeneand Eth ylenerawmatstar to be sourced domesL car ly andfrom Overseas <br />Descri ion of Inventor <br />18 Estimated average vol ue M j oventory on hand let Al l operations): 35000000.00 mate value of in—tory onhand requirements for finished roduct SM intermediate roduct and raw material benzene <br />19 What percentage ofyour j mentaywill leavethe statewithin 175 days? $ 33,950,0000091/ c', <br />In-state Out-of-state DeemjonlT MSal es <br />20 Estjmatetl annual sales: $ 1.031.00 $ Million US dollars in revenue Al roduct is taretedtobe sold on an zr-work basist. our customers .soretenue and commerical transfer of salewill take place at the )ant <br />C o�upl<.t EJ fo��u s�I( til S E 1("n"h'I to'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.