My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
9-27-21 Regular Meeting of the La Porte Development Corporation Board
LaPorte
>
.Agendas
>
Open Meetings
>
La Porte Development Corporation/4B
>
2021
>
9-27-21 Regular Meeting of the La Porte Development Corporation Board
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 4:03:22 PM
Creation date
7/25/2025 11:59:59 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Development Board Corporation/Type B
Meeting Doc Type
Agenda Packet
Date
9/27/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Edwards Asphalt Paving <br />Po Box 2397'5 <br />SOverthorne, Co 80498 <br />Phone� (970) 409-0417 <br />Ernail: try visadarnW@GmaiLcom <br />SEEM= <br />Asphalt ReSUrfacing Dairy Queen <br />Pre. -dean parking lot <br />Pre -patch areas needed <br />Appty hqUd SS1 aspha8t tack coat <br />AspenDora Contractors Bryan Moore <br />511 S Utal'i Street La Porte"Texas 901 <br />South IBroadway Stref.-!t <br />Estirnate <br />[Date <br />Res fac r t with 1 " of hot rn�x as alt LolLanrt corUpac-t a±1 a aNt <br />mmozm, <br />(281) 932-3128 <br />000263 <br />10/26/2020 <br />$7,483.00 <br />Notes: <br />Prices are SUbject to change ff scope of work changes <br />Prices are only good if both pro.jects are done as one pr(ajeclt <br />EdWards aspha6t paving requires a 33% deposit once equipment is on site and work has begun <br />Edwards asphalt paving wHI acqUire an additional 33% deposlt once all prep work is conip�eted <br />Edwards asphMt pavng wM require balance Upon crab pletiran aH checks vviH and mUst be niade <br />payable to (ffl(Travis Edwards)))))) <br />Edwards asphalt pavng gives a one-year maintenance -free guarantee against potho�es <br />Edwards asphalt pavIng does not gUarantee any dralnage with a grade of less than 2% <br />Edwards asphalt paOng cannot gt.iarantee agalnst vegetation growth <br />Asphalt thickness is 1 " after compacflon <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.