My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-21-11 Planning and Zoning
LaPorte
>
.Agendas
>
Open Meetings
>
Planning & Zoning Commission
>
Planning/Inspections
>
Planning and Zoning Commission
>
2011
>
04-21-11 Planning and Zoning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2011 3:36:03 PM
Creation date
7/25/2025 12:01:24 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
4/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TRAFFic EjvGijvEERs, / C. <br />'Fable 2 Background and Future LOS <br />LOS / Delay (s) <br />SH 225 EBFR at Sens Road <br />SH 225 WBFR at Sens Road <br />AM Peak <br />PM Peak <br />Background <br />Future <br />Background <br />Future <br />€ B / 13 <br />B / 12 <br />A/9 <br />A / 10 <br />1 A/8 <br />A / 9 <br />B / 14 <br />B / 14 <br />As shown in Table 2, the added <br />traffic is not projected to <br />substantially impact the LOS at <br />the two analysis intersections. <br />The existing volumes are low <br />compared to the capacity of the intersections and will remain comparatively low even with the addition <br />of site - generated traffic. The per - vehicle delays at the intersection of SH 225 EBFR at Sens Road in the <br />AM Peak is actually projected to improve: this is due to the high number of right -turns onto the SH 225 <br />EBFR for site - generated traffic. Vehicles making the right -turn movement incur less delay than the <br />average vehicle utilizing the intersection because of their ability to make a right -turn on red. <br />Because the analysis indicates the distribution center will have no significant traffic impacts no street or <br />signal improvements are recommended. If you have any questions regarding the results of this analysis, <br />please contact me at 713- 398 -7461 or e -mail r u ', , <br />Sincerely, <br />Attachments <br />AM and PM Peak Hour Turning Movement Counts <br />ITE Trip Generation <br />Existing Capacity Analyses <br />Future Capacity Analyses <br />THE TEAM YOU CAN DEPEND ON PAGE 4 OF 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.