My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-17-11 Planning and Zoning
LaPorte
>
.Agendas
>
Open Meetings
>
Planning & Zoning Commission
>
Planning/Inspections
>
Planning and Zoning Commission
>
2011
>
11-17-11 Planning and Zoning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2011 8:54:06 AM
Creation date
7/25/2025 12:01:33 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
11/17/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3) Reviewing existing ordinances that guide local development to ensure <br />that existing policies and implementation tools are in accordance with <br />best management practices. <br />4) Pursuing intergovernmental coordination with HCFCD and neighboring <br />cities in addressing drainage across the broader region. <br />5) Encouraging the joint use of detention areas for drainage and parks and <br />recreation amenities. <br />Based on these considerations, the following goals, actions, and initiatives <br />address specific issues and needs identified during the public participation <br />process (and outlined in Chapter 1, Plan Context). <br />GOAL 1: Improve the City's drainage system to reduce future flood evenra <br />from causing impacts to life and property. I <br />Actions and Initiatives <br />1) In conformance with the specifications set forth in the Citywide Drainage <br />Study, construct the recommended relief swale and pipe upgrade <br />projects, including: <br />a. Pinegrove Valley: Relief Swale; <br />b. Brookglen: Relief Swale and Outfall Pipe Upgrade; <br />c. Fairmont Park West: Relief Swale and Outfall Pipe Upgrade; <br />d. Glen Meadow: Relief Swale and Outfall Pipe Upgrade; <br />e. Meadow Park: Relief Swale and Outfall Pipe Upgrade; <br />f. Fairmont Park: Relief Swale and Outfall Pipe Upgrade; <br />g. Creekmont Section 1: Relief Swale and Outfall Pipe Upgrade; <br />h. Fairmont Park East: Relief Swale and Outfall Pipe Upgrade; <br />i. Spencer Highway: Relief Swale; <br />j. Villa Del Rancho: Relief Swale; <br />k. Battleground Estates: Relief Swale; and <br />I. Old La Porte: Relief Swale and Outfall Pipe Upgrade. <br />2) In conformance with the specifications set forth in the Citywide Drainage <br />Study, construct the recommended channel improvement and pond <br />projects, including: <br />a. Fairmont Park, Fairmont Park East: Channel Widening; <br />b. Brookglen: Channel Lining; <br />c. Meadow Park, Villa Del Rancho: Channel Widening; <br />d. Lennox Gardens; L Street: Pond for Diversion; <br />e. Battleground Estates, Pinegrove Valley, P Street: Channel Lining; <br />f. Shady River: Channel Widening; <br />g. Woods on the Bay, Pine Bluff, Shady River: Channel Widening; and <br />h. Meadow Crest, Creekmont, Glen Meadows, Fairmont Park, Fairmont <br />Park West: Pond for Diversion. <br />3) Pursue inter -local agreements with the Harris County Flood Control <br />District ( HCFCD) regarding maintenance of drainageways. This would be <br />for those drainageways where agreements may not already exist and for <br />A COMMUNIT VISION FOR 1A PORTE, TEXAS - 2010 UPDATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.