My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-19-12 Regular, Public Hearing and Workshop Meeting of the Planning and Zoning Commission
LaPorte
>
.Agendas
>
Open Meetings
>
Planning & Zoning Commission
>
Planning/Inspections
>
Planning and Zoning Commission
>
2012
>
01-19-12 Regular, Public Hearing and Workshop Meeting of the Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2012 5:32:48 PM
Creation date
7/25/2025 12:01:35 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
1/19/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT JANUARY u0,zozz <br />/ <br />0 Tom cm� <br />State Highway 146 <br />Un its northern segment U.e, north of Fairmont <br />Fairmont Parkway <br />Fairmont Parkway isa major east-west connector for the City of La Porte as it <br />connects directly to Beltway 8and terminates near Downtown La Pore at <br />Sylvan Beach. Previously, the corridor was under consideration to be <br />converted into atoll road. That proposal is no longer under consideration <br />and subsequently, Harris County, Precinct 2, has moved forward with a four- <br />phase wideningprojeot. <br />Local Tran Network <br />, TxDOTS.Kl46 Major Investment Study (MB). <br />Phone interview with Patrick Gant, Engineer with the Texas Department of <br />Transportation. 01/09/12 <br />S.H. 146 traverses La Porte on a north/south <br />alignment and extends Interstate 45 in Texas <br />City through La Porte intersecting with <br />Interstate 10 and continuing north toS.H. yU. <br />This corridor has been identified by the <br />rajmmon*phwy <br />Houston-Galveston Area Council (H-GAO, the <br />' <br />region's Metropolitan Planning Organization <br />Zed akrff <br />(MPU), as a candidate for significant <br />infra��ruotueinve�tment . <br />'MMim <br />Currently, S.H. 146 is undergoing asignificant <br />����----- <br />improvement project which will add sufficient <br />FM 617 <br />capacity to meet the needs of corridor <br />residents through the year 2U2l^ <br />Un its northern segment U.e, north of Fairmont <br />Fairmont Parkway <br />Fairmont Parkway isa major east-west connector for the City of La Porte as it <br />connects directly to Beltway 8and terminates near Downtown La Pore at <br />Sylvan Beach. Previously, the corridor was under consideration to be <br />converted into atoll road. That proposal is no longer under consideration <br />and subsequently, Harris County, Precinct 2, has moved forward with a four- <br />phase wideningprojeot. <br />Local Tran Network <br />, TxDOTS.Kl46 Major Investment Study (MB). <br />Phone interview with Patrick Gant, Engineer with the Texas Department of <br />Transportation. 01/09/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.