My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-16-15 Regular Meeting of the Planning and Zoning Commission
LaPorte
>
.Agendas
>
Planning/Inspections
>
Planning and Zoning Commission
>
2015
>
07-16-15 Regular Meeting of the Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 3:40:25 PM
Creation date
7/25/2025 1:15:19 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
7/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENTA <br />Ordinance of the City of La Porte, as the same may be amended from time to time. Amendments <br />to the General Plan, the Special Conditional Use Permit, and/or this Agreement shall be in <br />writing. <br />2.3 Additional Land Use Restrictions. Owner/Developer agrees to conform all <br />development and improvements to the Tract to the City’s Code of Ordinances and established <br />policies, and further agrees that land uses shall be further restricted according to Exhibit C, <br />except for the permitted uses authorized by Exhibit “C”. <br />ARTICLE III. RESTRICTIVE COVENANTS <br />3.1 Development of Restrictive Covenants. Owner-Developer has developed a Draft <br />Declaration of Restrictive Covenants for Port Crossing, which are attached to this Agreement as <br />Exhibit “D”. These protective covenants and deed restrictions will apply to and be binding upon <br />the Tract, and shall be in form substantially similar to Exhibit “D”. The covenants and deed <br />restrictions have been approved by the City and have been recorded concurrently with each <br />recorded plat. <br />ARTICLE IV. TERMINATION <br />. <br />4.1 TermThis Agreement shall have a term commencing on the date first written above, <br />and continuing until the date in which all portions of the Tract have been platted and developed <br />(with construction of all streets and utilities on the Tract as reflected by the Plat completed or <br />installed and financed by the Owner-Developer. <br />Failure of Owner-Developer to begin construction in accordance with the Special Conditional <br />Use Permit as scheduled under the terms of the Special Conditional Use Permit, shall terminate <br />this Agreement. Owner-Developer may, before the expiration of one year, request an extension <br />of time from the Planning and Zoning Commission, in the event that construction has not started <br />in accordance with the Special Conditional Use Permit. <br />ARTICLE V. OPEN SPACE/TRAIL, BUFFERING AND BEAUTIFICATION <br />5.1 Open Space/Pedestrian Trail System. The Owner-Developer shall provide common <br />open space as shown in Comprehensive Plan and the General Plan, including any required <br />portion of planned City trail system within the project consisting of public sidewalks within the <br />rights-of-way noted on the Plat on at least one side of each street, together with landscaping <br />adjacent to such sidewalks pursuant to the landscape plan approved by the City. Owner- <br />Developeralso will cooperate with any additional trail system plan on property dedicated to the <br />City in fee or as an easement within the drainage easement and/or detention pond/drainage <br />system shown on the General Plan. <br />It is recognized that, until the final design of the detention pond/drainage system is approved, the <br />exact location and dimensions of these facilities is unknown. When the final design is approved <br />the City will evaluate the potential for use of these areas as public recreation amenities. <br />).docx- 3 - <br />H-02-Draft Development Agreement (showing changes <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.