10V R11leJ <br />To: La Porte Area Water Authority Board <br />From: David Mick, Public Works Director <br />C: Steve Gillett, Don Pennell, Michael Dolby <br />Date: Feb 1, 2012 <br />Re: Background Information for February 8, 2012 Agenda Item #5 <br />LPAWA Board: <br />Thank you for your time and consideration of the items on this agenda. Agenda Item #'s 1 — 3 are straight- <br />forward. Michael Dolby, City Financial Officer, will present Item #4 at the meeting. The purpose of this memo <br />is to address Item #5: Status Update of the City of Houston 2007 — 2010 True Up and the Southeast Houston <br />Water Purification Plant (SEWPP) Manager/Operator Contract Study. <br />Staff's July 21, 2011 memo to the board provided background information that is also relevant to this item. A <br />copy of the memo text is attached for your convenience. During your August 1, 2011 meeting, the board agreed <br />to financially participate with the City of Pasadena professional services contracts for engineering, accounting and <br />legal assistance necessary to protest the City of Houston (COH) true up invoices and to investigate alternatives for <br />changing the operations and management structures for SEWPP. <br />TRUE UP UPDATE: At the January 12, 2012 operator's meeting, COH staff distributed a draft settlement <br />agreement for the 2007 — 2010 True Ups that they are claiming are owned to COH. However, this was not a <br />formal request from which COH is anticipating a response. The preliminary draft indicates that COH will waive <br />the 2009 invoice to LPAWA in the amount of $274,018 if LPAWA agrees to pay the FY 2010 True Up invoice <br />of $138,898. Note that COH has not presented invoices for 2007 and 2008. Considerations for the board are: <br />COH has not submitted the 2010 True Up within the timeframe provided in the contract, COH has not submitted <br />a 2010 financial report that meets the generally accepted standards for an audited report as required by the <br />contract, COH has not provided an accounting for "allocated" costs that on the surface appear to be contrary to the <br />contract, and finally, if accepted by the co -participants, the concern that the COH method for calculating the 2010 <br />True Up would then become the new baseline for distributing cost to the co -participants in subsequent years. <br />Action Item: Discuss the board's leanings on this issue and discuss desired procedure iFwhen the official <br />settlement agreement is received by staff. <br />PLANT MANAGER AND OPERATOR CONTRACT STUDY UPDATE: Subsequent to your August 1 <br />authorization, the co -participants contracted with Freese and Nichols Inc. (FNI) for a study of the SEWPP <br />management and operations. Phase 1 of the study is nearly complete. <br />There were two primary goals of the Phase 1 study: 1) Determine if there is sufficient interest from private <br />companies to operate and/or manager the plant (there is), 2) Determine if private contractors can perform these <br />functions more economically than COH (likely on the management side, perhaps not on the operations side). <br />If desired by the co -participants, Phase 2 will include a rewrite of the existing contracts and procurement of a <br />private contractor for certain management and operations activities. COH can be replaced as manager and/or <br />