My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-17-08 Meeting of the La Porte Redevelopment Authority
LaPorte
>
.Agendas
>
La Porte Redevelopment Authority/TIRZ
>
LPRDA
>
2008
>
12-17-08 Meeting of the La Porte Redevelopment Authority
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2014 8:24:53 AM
Creation date
7/25/2025 3:00:15 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agendas
Date
12/17/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SPECIAL PROVISIONS FOR PERMIT NUMBER <br />08N0495 <br /> <br />1. All Pipes used shall be Reinforced Concrete Pipe (RCP). <br /> <br />2. Culvert crossings within the 30-foot clear zone (parallel culverts) shall be required to have minimum 6:1 <br />sloping ends known as Safety End Treatments (SETs). The culvert shall have sufficient length to allow the 6: 1 <br />slope to be achieved from the edge of pavement to the flowline at the end of the SET. Culverts that exceed 50' <br />in length shall have ajlIDction box for clean out as specified by the Area Engineer. <br /> <br />3. Culverts larger than single 30-inch diameter (or larger than multiple 24-inch diameter culverts) shall require <br />safety pipe runners. <br /> <br />4. Riprap or stabilizing material shall be provided and installed by gra~tee at time of construction as directed by <br />Area Engineer. <br /> <br />5. FOR TXDOT MAINTAINED ASPHALT SURFACED PAVEMENT no concrete pavement or curbing shall <br />be allowed within State right of way. (See attached driveway profile.) <br /> <br />6. FOR TXDOT MAINTAINED CONCRETE SURFACED PAVEMENT, additional full-depth saw cuts may be <br />made as needed to facilitate removal of the concrete within the limits of the required full-depth cuts. Concrete <br />adjacent to the patch shall not be spalled or fi-actured by the removal procedure.(See attached driveway profile.) <br /> <br />7. Placement or removal of beautification on State right of way shall be under the direction of the Texas <br />Department of Transportation. <br /> <br />8. The Grantee certifies that its storm water runoff to the State's right of way shall not be contaminated by any <br />industrial processes or significant pollutants, and the State shall not be held liable for any pollutants entering <br />State right of way through storm water connections. <br /> <br />9. Grantee shall meet all Americans with Disabilities Act (ADA) and Texas Department of Licensing Regulation <br />(IDLR) requirements for items including but not limited to side walks and wheelchair ramps. <br /> <br />10. Grantee shall obtain overall environmental clearance with all appropriate regulatory agencies prior to beginning <br />construction. Approval of this request by TxDOT does not relieve the Grantee or its agents of this obligation. <br /> <br />11. Work performed on railroad right-of-way or easements controlled by others is subject to the concurrence ofthe <br />owner of said properties. Approval of this request by TxDOT does not relieve the Grantee of this obligation. <br /> <br />12. The complete permit package shall be on the project site at all times and available for review by TxDOT. <br /> <br />The Texas Department of Transportation will assist as follows: <br /> <br />1. Provide flow line elevation and inspection of construction. <br /> <br />2. This permit issued subject to a traffic control plan, which will be approved by the Area Engineer. No work <br />within State right of way shall begin until this approval has been granted. <br /> <br />SPECIAL NOTE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.