Laserfiche WebLink
EXHIBIT A <br />TO <br />ORDINANCE 1444-A <br />Small Lots <br />Large Lots <br />PERMIT REQUIREMENTS AND CONDITIONS <br />All Lots <br />less than 1 acre <br />1 acre or more <br />1-5 Loads <br />6-49 Loads <br />50 and more Loads <br />6-49 Loads <br />50 and more Loads <br />1 <br />Permit Required <br />2 <br />Permit Fee Assessed <br />3 <br />180 Day Permit for Project Completion <br />4 <br />Spreading of Delivered Fill Must Begin within 30 Days <br />For Open Ditch Roadways Maximum Fill to be 6 inches below <br />5 <br />top of adjacent crown of road <br />Recommended overland slope for lot grading to be 0.2%-0.75% <br />6 <br />For Curb & Gutter Streets, Grade Fill at 0.2%-0.75% toward <br />GA <br />street <br />" <br />For Lots Abutting an Alley Way, Match the Grade of the Alley <br />" <br />7 <br />and Grade to Drain Toward Street <br />Grading & Drainage Plan submitted signed and sealed by <br />8 <br />Professional Engineer licensed in the State of Texas <br />Storm Water Pollution Prevention Plan and Revegetation Plan <br />SA <br />submitted <br />Demonstration that Watershed is Not Being Adversely <br />8B <br />Impacted <br />8C <br />Grade of swales to be customed/en ineered for each site <br />9 <br />Sketch, Survey or Site Plan Showing Proposed Fill Placement <br />" <br />"See Item 8 <br />'See Item 8 <br />and Location of Proposed Drainage drawn to scale <br />10 <br />Silt Prevention and Revegetation Ian required <br />"See Notes 3&4 <br />'See Item 8A <br />'See Notes 3&4 <br />'See Item BA <br />11 <br />1 ft To of Bank Swale Offset from Property Line <br />" <br />12 <br />5 ft To of Bank Swale Offset from Property Line <br />13 <br />No Fill Unloaded within 15 ft of Property Line <br />14 <br />No Fill Unloaded within 5 ft of Property Line <br />Address for Site Required And Fill Must be Delivered to this <br />15 <br />address <br />Any deviation from these permit requirements Shall be Reviewed <br />16 <br />and Approved By the City <br />' = Required Information, Activity or Regulation <br />Note: <br />1 No dump trucks larger than 12 CY dump trucks shall be allowed for use in deliver to addresses off truck routes. <br />2 Only one Fill Dirt Permit will be issued for any one property or address over a 180 day span. <br />3 Silt prevention plan shall at a minimum consist of silt fencing or block sodding rows of sod 2' wide along the leading edge of the filled area. <br />4 Revegetation shall consist of seeding, sprigging, sodding; turf establishment (or combination thereof) that produces an effective vegetative cover of 75% within 90 <br />days. <br />