My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-17-07 Meeting of Drainage and Flooding Committee
LaPorte
>
.Agendas
>
Drainage and Flooding Committee
>
2007
>
09-17-07 Meeting of Drainage and Flooding Committee
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2025 1:32:51 PM
Creation date
7/25/2025 3:05:34 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agendas
Date
9/17/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
tion standards in force in several watershed communities were inadequate to prevent increases in <br />downstream flooding. Finally, the study identified significant areas of natural storage upstream. If <br />this storage were to be removed, flood damages in our watershed would go up by 50% or more. <br />Recognizing their vulnerability, downstream communities requested the cooperation of all the <br />towns of the watershed to continue to work together to prevent flooding from becoming worse. <br />Fortunately, communities responded positively; the study had driven home the fact that flooding <br />is a watershed problem that begins when the first raindrop hits the upland. <br />MULTI -OBJECTIVE GOALS Our Committee first established the following goals that clearly <br />lay out the multi -objective nature of our work: <br />1. Reduce flooding and minimize streambank erosion in the Butterfield drainage basin. <br />2. Protect the storm and floodwater capacities of natural detention areas and protect wetlands. <br />3. Preserve public open space to increase recreational opportunities (including trails), protect and <br />enhance natural resources, and improve the environment of communities and neighborhoods. <br />4. Improve stream maintenance to maximize natural resource benefits and aesthetics. <br />5. Improve the quality of water in Butterfield Creek and its tributaries. <br />6. Achieve a mutually supportive, basin -wide management and regulatory framework for develop- <br />ment activities affecting Butterfield Creek. <br />TAKING ACTION With goals adopted, our next step was regulatory. We needed to address those <br />critical issues pointed out by the engineering study. The Butterfield Creek Model Floodplain and Storm - <br />water Management Code was published in November, 1990 and has since been adopted by all five of <br />the critical upstream communities of the watershed. Here are some highlights of our model code: <br />• We are requiring that the storage capacity of those all important natural storage areas be main- <br />tained. Because portions of these areas are outside wetlands and floodplains, they were previously <br />unregulated. Now, any construction on these properties will require compensatory storage to make <br />up for lost natural storage. This is in addition to the usual detention requirements. <br />• Detention requirements have been significantly strengthened. We have beefed up detention standards <br />to match real world conditions. Release rates must meet 100-year storm limits of 0.15 cubic feet per <br />second per acre and two-year storm limits of 0.04 cubic feet per second per acre. The two-year <br />requirement is aimed at stabilizing runoff rates to prevent increased erosion of downstream channels. <br />• The adverse water quality effects of development are addressed by requiring effective soil erosion <br />and sediment control, encouraging "natural" drainage practices such as swales and vegetative <br />filters, and specifying detention basin designs which enhance pollutant removal. <br />• Our regulatory floodplains have been expanded to coincide with those demonstrated by the engineer- <br />ing study. The revised mapping has also been adopted at our request by the State regulatory agency. <br />• We have limited uses in the floodway, allowing only public flood control, public recreation and <br />open space, crossing roads and bridges. <br />Success Stories 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.