Laserfiche WebLink
• • <br />Preliminary Plat Checklist Contd. <br />Page 2 of 2 <br />15. Building Lines : Properly noted. <br />16. Layout & Identification : Properly noted. <br />17. Condominiums : N/A <br />18. Reserves : N/A <br />19. Streets : Properly noted. Design adequate. <br />20. Street Names : Properly noted. No name duplication. <br />21. Utility Easements : Properly noted. <br />22. Flood Hazard Area : N/A <br />23. Survey Monument Tie In: Properly noted. <br />24. Survey Control Monuments : See comments section. <br />25. Schematic Utility Layout : Reviewed and acceptable. <br />B. Documentation <br />1. La Porte Development Checklist : Properly filled out and submitted. <br />2. Title Certificate : Submitted. <br />3. Utility Schematics : Submitted and reviewed by staff. <br />Comments <br />* Five survey monuments will be required (1 for each 5 acres) Staff is working with <br />Engineer to determine most advantageous locations. Locations of installed monuments <br />to be shown on Final Plat. <br />Reviewed By: ~ ~. Date: 12/1/95 <br />