My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-27-11 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2011
>
06-27-11 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2011 11:43:53 AM
Creation date
7/25/2025 3:09:26 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
6/27/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
mark up Drought Contingency Plan- La Porte June 2011 Updatedoc (2).doc <br />c. Severe Condition Goal - To achieve a 25 percent reduction in daily water use. <br />d. Critical Condition Goal To achieve a 30 percent reduction in daily water use. <br />E. INFORMATION /EDUCATION <br />As a component of the Information /Education section in the Water Conservation Plan, the <br />purpose and effect of the Drought Continaencv Plan will be communicated to the public <br />F. IMPLEMENTATION /ENFORCMENT <br />The plan shall be implemented by Ordinance of the City Council of the city* of La Porte. <br />Included in the adoption instrument will be individual trigger conditions for the city*. A copy <br />of the adoption vehicle is found in Appendix B. <br />It will be the responsibility of the City of La Porte Public Works Director to monitor, through <br />the utility department, the status of the water supply* and distribution system. When a trigger <br />condition is reached, the Public Works Director will notifi- the public through its information <br />program, of the implementation of the Drought Contingency* Plan. <br />The Public Works Director will continue to monitor the water emergency* until it is <br />determined that the trigger condition no longer exists. When this takes place, the Public <br />Works Director will notifi- the public of such, and the Drought Condition Abatement <br />procedures will be implemented. <br />G. UPDATE OF TRIGGER CONDITIONS <br />Once a year, the City will examine the production requirements and ability* to maintain these <br />requirements to determine if trigger conditions need to be reestablished. Consideration <br />should be given to the cityT's usage in relation to the aggregate usage, and any anticipated <br />increase in production at the Southeast Water Purification Plant. <br />Page 5 of 5 <br />Throughout the period of a trigger condition, regular zt�cl,uPsat will appear tp the <br />yaraq to explain and educate the public on the purpose, cause, and methods of <br />conservation for that condition. <br />
The URL can be used to link to this page
Your browser does not support the video tag.