HDRIC &M Job No. 10 -105 <br />CITY OF LA PORTE <br />Emergency Power to Warter and Wastewater Facilities <br />Bid Date: 6/19/11 <br />Page 1 OF 3 <br />LOW BIDDER <br />Cresent Electric <br />Hi -Tech Electric, Inc. <br />C.F. McDonald Electric, Inc. <br />ITEM <br />ITEM DESCRIPTION <br />UNIT <br />QUAN. <br />UNIT <br />TOTAL <br />TOTAL <br />UNIT <br />TOTAL <br />NO. <br />PRICE <br />AMOUNT <br />PRICE <br />AMOUNT <br />PRICE <br />AMOUNT <br />BASE BID - WASTEWATER FACILITIES ITEMS <br />Electrical System Installation - Lift Station No. 1A. - Provide and install <br />all work shown on plans and described in specifications including the <br />following: Provide and install one 125 kW natural gas generator system <br />1 <br />including switch, power feeders, weatherproof enclosure, modifications to <br />electrical natural gas line installation, concrete pad, automatic transfer <br />service equipment, all required electrical work, and all required <br />appurtenances as shown on plans and as described in specifications for a <br />complete operating system for a lump sum of: <br />LS <br />1 <br />$120,000.00 <br />$120,000.00 <br />$106,838.001 <br />$106,838.00 <br />$103,327.001 <br />$103,327.00 <br />Natural Gas Service — Lift Station No. 1A - Include an "Allowance" for <br />2 <br />natural gas service by the local Natural Gas Provider. Exact amount will <br />be reimbursed to Contractor upon submittal of invoice from Natural Gas <br />Service Provider for a lump sum of: <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />$5,000.00 <br />$5,000.00 <br />$5,000.00 <br />$5,000.00 <br />Electrical System Installation — Lift Station No. 8 - Provide and install <br />all work shown on plans and described in specifications including the <br />3 <br />following: Provide and install manual transfer switch, generator breaker, <br />generator connector, all required electrical work, and all required <br />appurtenances as shown on plans and as described in specifications for a <br />complete operating system for a lump sum of: <br />LS <br />1 <br />$22,000.00 <br />$22,000.00 <br />$18,708.00 <br />$18,708.00 <br />$17,100.00 <br />$17,100.00 <br />all work shown on plans and described in specifications including the <br />following: Provide and install manual transfer switch, generator breaker, <br />4 <br />generator connector, all required electrical work, and all required breaker, <br />generator connector, all required electrical work, and all required <br />appurtenances as shown on plans and as described in specifications for a <br />complete operating system for a lump sum of: <br />LS <br />1 <br />$20,000.00 <br />$20,000.00 <br />$37,291.00 <br />$37,291.00 <br />$45,149.00 <br />$45,149.00 <br />Electric Service — Lift Station No. 13 Include an "Allowance" for electric <br />service by the local Electric Service Provider. Exact amount will be <br />5 <br />reimbursed to Contractor upon submittal of invoice from Electric Service <br />Provider for a lump sum of: <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />$5,000.00 <br />$5,000.00 <br />$5,000.00 <br />$5,000.00 <br />Electrical System Installation — Lift Station No. 30 - Provide and install <br />all work shown on plans and described in specifications including the <br />following: Provide and install 80 kW natural gas generator system <br />6 <br />including natural gas line installation, concrete pad, automatic transfer <br />switch, power feeders, weatherproof enclosure, modifications to electrical <br />service equipment, all required electrical work, and all required <br />appurtenances as shown on plans and as described in specifications for a <br />complete operating system for a lump sum of: <br />I LS <br />1 1 <br />1 $110,000.001 <br />$110,000.001 <br />$94,526.001 <br />$94,526.001 <br />$93,457.001 <br />$93,457.00 <br />Bid Date: 6/19/11 <br />Page 1 OF 3 <br />