My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-12-11 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2011
>
09-12-11 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2011 12:07:15 PM
Creation date
7/25/2025 3:10:12 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
9/12/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Battleground Estates Prelimi=ry Eug necring Report <br />City of La Porte <br />Mott Associates Project I~io. 0127.Oxx.Oloc <br />saris -11 <br />2 <br />Detamate areas fbat need u usin L . =E2ble LMAit - <br />1 <br />l <br />4 <br />6 <br />3 <br />berermine areas where additional bydrolopt or hvdraulie model am is needed <br />t <br />1 <br />3 <br />5 <br />4 <br />Coordinate with City oa data that is available <br />t <br />1 <br />3 <br />5 <br />Total cost per tasks <br />$5.433 <br />T2sk46 - Rvdral2 .e and FIvdrrvlic Modeling <br />1 <br />In sure datl and or LIDAR data im the ME models <br />t <br />9 <br />9 <br />19 <br />2 <br />Include other specific information from staff <br />1 <br />5 <br />7 <br />3 <br />Perform hydrolc e =*Ivsis for dezi flows forthe vratesbed fortho 5, 10, 50 and 100 yev <br />1 <br />1 <br />9 <br />9 <br />20 <br />d 1 <br />U dmethe flows forthe watetsbeds IZO the available hydrologic data <br />0.5 <br />3 <br />3 <br />7.5 <br />5 <br />Perform tyjatffie =alvsis <br />0.5 <br />1 <br />9 <br />]0.5 <br />Total cost task 6 <br />5 �•� 0 <br />Task #7— Analvxe Potential Alternative¢ <br />1 <br />Swdy 2nd 2nalyw alteYaatives for dmina 2rrovemmts <br />4 <br />2 <br />9 <br />6 <br />3 <br />24 <br />2 <br />Determine the additional dratrege right-Of-way =ts <br />OS <br />1 <br />4 <br />5.5 <br />Total cost 2cr task 7 <br />56 <br />222S -Re ortRecurnrocndataos <br />1 <br />Prnnare construction cost cSt=ntes and im lemet'r=on planL <br />t <br />2 <br />9 <br />12 <br />24 <br />2 <br />Evaluatebened a dcosts <br />2 <br />1 <br />12 <br />A <br />19 <br />' <br />3 <br />Provide r ccom ^^k=* for a iar rovemants <br />3 <br />fi <br />S <br />4 <br />21 <br />4 <br />Pr areaProlimi� Eneanca.'in rt <br />3 <br />6 <br />18 <br />12 <br />6 <br />4$ <br />' $ <br />Present tea ics =d a PDF version of the draft lwto staff aadcouacil <br />6 <br />1 <br />6 <br />1 <br />14 <br />6 <br />hrn' orate hcablc clean m to the draft report <br />3 <br />1 <br />6 <br />6 <br />16 <br />7 <br />Submittcn ' tcd cs and PDF version of the final rt to the <br />0.5 <br />1 <br />2 <br />3S <br />8 <br />Attendmorrthl meetin r ed emeat and coutroL Include aworksho Cotatctl <br />18 <br />40 <br />12 <br />4 <br />7 <br />Total cost per task S <br />$50333 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.