My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-12-12 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2012
>
03-12-12 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2012 4:48:18 PM
Creation date
7/25/2025 3:11:26 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
3/12/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY COUNCIL DRAINAGE REPORT <br />March12, 2012 <br />Contract Design and Construction <br />Design of Sheet Flow Relief Structure Improvements to Creekmont, Fairmont <br />Park West, Brookglen and Fairmont Park East.All work is complete. As-built <br />planscomplete,HCFCD inspection scheduled for March 14, 2012. <br />th <br />South 16Streets.Design in progress;plans at 95%, addressing agency <br />comments. <br />F101 Channel Improvements by HCFCD. Hydro excavation complete. Land <br />Dev Engineering preparing Preliminary Engineering Reportto be finalized by <br />January 2013. <br /> <br />In-House Design and Construction of City-Initiated Projects <br />F-216 Regional Detention Project.Construction issubstantially complete. <br />Battleview Area.Survey and design complete. Plans submitted for pipeline and <br />agency review. <br />East Main.Construction approximately 50% complete. <br /> <br />Adams Street.Letter of no objection from Exxon Mobile Pipelinereceived. <br />Construction underway. <br />Sunrise and Broadway.Installation of additional culverts by Public Works at <br />South Shady Lane and Baywood along Broadway in progress. <br />Battleground Estates and Shady River.Working with HC and HCFCD. <br />In-House Drainage Maintenance Activities <br />North Shady Lane.Working to secure easement to improve and clean existing <br />drainage swaleon South Shady Lane and making design modifications to North <br />Shady Lane. <br />In-Fill DrainageMaintenance.Public Works working ondrainage maintenance in <br />the Pine Bluff area. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.