My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-09-12 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2012
>
04-09-12 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2012 5:06:43 PM
Creation date
7/25/2025 3:11:38 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
4/9/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.7.2Define in Contract Documents the Contractor(s) (and or Vendor(s)) responsibility in <br />connection with the start up, refining, and adjustment of any equipment or system. <br />1.7.3Define in Contract Documents the Contractor(s) (and or Vendor(s)) responsibility <br />for training ownersstaff to operate and maintain any equipment or system and for <br />reviewing pertinent manuals, submittals, shop drawings, and warranties supplied by the <br />Contractor(s), Vendor(s), or Manufacturer(s) as the case may be. <br />1.7.4Coordinate, attend and participate in the start up and training orientations as <br />described in paragraphs 1.7.2 and 1.7.3. <br />1.7.5Record Drawings. <br />ARCHITECT shall furnish the OWNER a set of marked up printsand a <br />scanned set on DVD,drawings and other data kept by the Contractor(s), andProject <br />Representative (if employed by the ARCHITECT) in a form and manner that clearly <br />depicts significant changes made during the construction process. <br />1.7.6At a time eleven (11) months following Substantial Completion of the project (one <br />month prior to expiration of the Contractor's warranty period), the ARCHITECT, in the <br />company of the OWNER, will visit the project to observe any apparent deficiencies in the <br />completed construction, and document any items observed in a written report issued to the <br />CONTRACTOR and OWNER. <br />1.7.7During the Operational Phase, the ARCHITECT will assist the OWNER in <br />consultations and discussions with CONTRACTOR concerning the correction of <br />deficiencies brought to the ARCHITECT's attention, and when appropriate, review or make <br />written recommendations regarding replacement or correction of the Work as proposed by <br />the Contractor. <br />1-8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.