My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-09-12 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2012
>
04-09-12 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2012 5:06:43 PM
Creation date
7/25/2025 3:11:38 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
4/9/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
related meetings, and prepare and circulate copies of minutes <br />thereof. <br />3.Liaison: <br />a.Serve as ARCHITECT’s liaison with CONTRACTOR, working <br />principally through CONTRACTOR’s superintendent and assist in <br />understanding the intent of the Contract Documents; and assist <br />ARCHITECT in serving as OWNER’s liaison with CONTRACTOR <br />when CONTRACTOR’s operations affect OWNER’s on-site <br />operations. <br />b.Assist in obtaining from OWNER additional details or information, <br />when required for proper execution of the Work. <br />4.Shop Drawings and Samples: <br />a.Record date of receipt of Shop Drawings and samples. <br />b.Receive samples that are furnished at the site by CONTRACTOR, <br />and notify ARCHITECT of availability of samples for examination. <br />c.Advise ARCHITECT and CONTRACTOR of the commencement <br />of any Work requiring a Shop Drawing or sample if the submittal <br />has not been approved by ARCHITECT. <br />5.Review of Work, Rejection of Defective Work, Inspections and Tests: <br />a.Conduct on-site observations of the Work in progress to assist <br />ARCHITECT in determining if the Work is ingeneral proceeding in <br />accordance with the Contract Documents. <br />b.Report to ARCHITECT whenever RPR believes that any Work is <br />unsatisfactory, faulty or defective or does not conform to the <br />Contract Documents, or has been damaged, or does not need the <br />requirements of any inspection, test or approval required to be <br />made; and advise ARCHITECT of Work the RPR believes should <br />be corrected or rejected or should be uncovered for observation, <br />or requires special testing, inspection or approval. <br />c.Verify that tests, equipment and systems startups and operating <br />and maintenance training are conducted in the presence of <br />appropriate personnel, and that CONTRACTOR maintains <br />adequate records thereof; and observe, record and report to <br />ARCHITECT appropriate details relative to the test procedures <br />and startups. <br />d.Accompany visiting inspectors representing public or other <br />agencies having jurisdiction over the Project, record the results of <br />these inspections and report to ARCHITECT. <br />B-2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.