Laserfiche WebLink
PRELIMINARY COST ESTIMATE FOR PROPOSED PARKING LOT <br />ALONG THIRD STREET, LOTS 24-28, BLOCK 40 <br />CITY OF LA PORTE, TEXAS <br /> SECTION "A" - PAVING <br />ITEMBIDUNIT <br />NO.ITEM DESCRIPTIONUNITQUANTITYPRICEAMOUNT <br />1Mobilization for Entire Contract <br /> @_________________________________________________ <br /> _________________________________________________LS1.00$10,000.00$10,000.00 <br />Per Lump Sum <br />26" Reinforced Concrete w/ #4 Rebar on 24" Centers <br /> @_________________________________________________ <br /> _________________________________________________SY1,650.00$32.00$52,800.00 <br />Per Square Yard <br />3Manipulation of Lime Subgrade <br />@_________________________________________________ <br /> _________________________________________________SF15,720.00$1.50$23,580.00 <br />Per Square Foot <br /> <br />4Hydrated Lime & Lime Slurry <br />@_________________________________________________ <br /> _________________________________________________TON40.00$150.00$6,000.00 <br />Per Ton <br /> <br />5Striping <br />@_________________________________________________ <br /> _________________________________________________LS1.00$1,500.00$1,500.00 <br />Per Lump Sum <br />66" Dowel Curb <br />@_________________________________________________ <br /> _________________________________________________LF365.00$3.00$1,095.00 <br />Per Linear Foot <br />7Stormwater Pollution Prevention (BMP) <br />@_________________________________________________ <br /> _________________________________________________LS1.00$2,000.00$2,000.00 <br />Per Lump Sum <br /> <br />8Tie-In to Third Street <br />@_________________________________________________ <br /> _________________________________________________LS1.00$1,000.00$1,000.00 <br />Per Lump Sum <br /> <br /> <br /> SUBTOTAL SECTION "A" <br />$97,975.00 <br />Plus 15% Contingency <br />$14,696.25 <br />TOTAL PRELIMINARY ESTIMATE <br />$112,671.25 <br /> <br />