My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-11-12 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2012
>
06-11-12 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 1:00:05 PM
Creation date
7/25/2025 3:11:56 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
6/11/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PRELIMINARY COST ESTIMATE FOR PROPOSED PARKING LOT <br />ALONG THIRD STREET, LOTS 24-28, BLOCK 40 <br />CITY OF LA PORTE, TEXAS <br /> SECTION "A" - PAVING <br />ITEMBIDUNIT <br />NO.ITEM DESCRIPTIONUNITQUANTITYPRICEAMOUNT <br />1Mobilization for Entire Contract <br /> @_________________________________________________ <br /> _________________________________________________LS1.00$10,000.00$10,000.00 <br />Per Lump Sum <br />26" Reinforced Concrete w/ #4 Rebar on 24" Centers <br /> @_________________________________________________ <br /> _________________________________________________SY1,650.00$32.00$52,800.00 <br />Per Square Yard <br />3Manipulation of Lime Subgrade <br />@_________________________________________________ <br /> _________________________________________________SF15,720.00$1.50$23,580.00 <br />Per Square Foot <br /> <br />4Hydrated Lime & Lime Slurry <br />@_________________________________________________ <br /> _________________________________________________TON40.00$150.00$6,000.00 <br />Per Ton <br /> <br />5Striping <br />@_________________________________________________ <br /> _________________________________________________LS1.00$1,500.00$1,500.00 <br />Per Lump Sum <br />66" Dowel Curb <br />@_________________________________________________ <br /> _________________________________________________LF365.00$3.00$1,095.00 <br />Per Linear Foot <br />7Stormwater Pollution Prevention (BMP) <br />@_________________________________________________ <br /> _________________________________________________LS1.00$2,000.00$2,000.00 <br />Per Lump Sum <br /> <br />8Tie-In to Third Street <br />@_________________________________________________ <br /> _________________________________________________LS1.00$1,000.00$1,000.00 <br />Per Lump Sum <br /> <br /> <br /> SUBTOTAL SECTION "A" <br />$97,975.00 <br />Plus 15% Contingency <br />$14,696.25 <br />TOTAL PRELIMINARY ESTIMATE <br />$112,671.25 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.