Laserfiche WebLink
2 <br />CITY has determined that adequate resourcesare available to CITY to furnish potable water to <br />COMPANY based on the following terms and conditions, to-wit: <br />(A) COMPANY shall pay to CITY a one-time administrative fee of $6,500. <br /> <br />(B) The total amount of potable water approved to COMPANY is established at THREE <br />THOUSAND TWO HUNDRED FIFTY (3,250) gallons per day. This number is based on an <br />average of fifty (50) gallons per employee per day as established by CITY. <br /> <br />(C) The average monthly volume of NINETY NINE THOUSAND ONE HUNDRED TWENTY <br />FIVE (99,125) gallons is established by multiplying the average daily volume by a factor of <br />30.5, which shall be used to facilitate CITY’S utility service billings. <br /> <br />(D) Nothing contained in this Agreement shall obligate CITY to furnish more than the average <br />monthly volume of NINETY NINE THOUSAND ONE HUNDRED TWENTY FIVE (99,125) <br />gallons. Repeated consumption greater than the established average monthly volume may <br />result in termination of service. <br /> <br />(E) COMPANY shall pay the standard water tap/meter fee based on CITY’S current tap/meter <br />fee schedule. Upon final approval of COMPANY’S on-site and/or off-site utility <br />construction by CITY, COMPANY shall pay the CITY’S standard water deposit fee through <br />CITY’S Utility Billing Division prior to receiving water service from CITY. <br />(F) The cost of water up to the average monthly volume of NINETY NINE THOUSAND ONE <br />HUNDRED TWENTY FIVE (99,125) gallons shall be billed at one hundred fifty percent <br />(150%) of the CITY'S rate as established from time to time for commercial customers inside its <br />corporate limits. <br /> <br />(G) The cost of water for amounts used in excess of the established average monthly volume shall <br />be billed at two hundred percent (200%) of the CITY'S rate as established from time to time for <br />commercial customers inside its corporate limits. <br /> <br />(H) COMPANY shall submit a preliminary site plan showing the total acreage of the tract including <br />present and proposed improvements and a suitable location map of the site. COMPANY’S <br />development may be subject to certain additional requirements as described in Exhibit A. <br />These requirements shall be shown on the final site plan and approved by City. <br /> <br />(I) COMPANY’S site design and site development will, in certain cases, be subject to specific <br />“Rules and Regulations” as defined in Exhibit “C” of COMPANY’S Industrial District <br />Agreement with CITY. <br /> <br />(J) All plumbing installed by COMPANY connected to the domestic water line from CITY, shall <br />meet all applicable State of Texas and CITY plumbing code requirements. <br /> <br />(K) A reduced pressure zone backflow preventer shall be installed and maintained by COMPANY <br />to protect CITY from any possible cross-connections. <br /> <br />(L) COMPANY’S potable water supply system will be segregated from any existing and future fire <br />protection system. <br /> <br />